<?xml version="1.0" encoding="UTF-8"?>
<TEI xmlns="http://www.tei-c.org/ns/1.0">
  <teiHeader>
    <fileDesc>
      <titleStmt>
        <title>The five-day week in manufacturing industries</title>
      </titleStmt>
      <publicationStmt />
      <sourceDesc>
        <bibl>
          <msIdentifier>
            <idno>1801165092</idno>
          </msIdentifier>
        </bibl>
      </sourceDesc>
    </fileDesc>
  </teiHeader>
  <text>
    <body>
      <div>
        <pb n="1" />
        B;;
5;
Ng
        <pb n="2" />
        THE FIVE-DAY WEEK IN
MANUFACTURING INDUSTRIES
        <pb n="3" />
        RECENT STUDIES OF
INDUSTRIAL RELATIONS
PROBLEMS
PUBLISHED BY THE
National INpusTrial. CONFERENCE
Boarp, Inc.
247 Park Avenue, New York

Paper
Binding
Night Work in Industry..............$0.75
Industrial Group Insurance.......... .75
Industrial Lunch Rooms. ............ 1.00
Supplemental Bonuses for Wage Earners,
 Supervisors and Executives. ..... 1.00
Employee Thrift and Investment
Plans... .. 1.00

lot
Botts
Employee Stock Purchase Plans in the
United States ......................$2.50
Industrial Pensions in the United
States. ...........cviiiiiniiiinnn... 2.00
Industrial Relations Programs in Small
Plan. . , comms anig andi siioe noms s 150
The Five-Day Week in Manufacturing
Industries. .............. vs ne 530
Complete list of publications sent on request
        <pb n="4" />
        THE FIVE-DAY WEEK

IN MANUFACTURING

INDUSTRIES

BL ND,
I
a E
O)
Ye, ps
Ne

NATIONAL INDUSTRIAL CONFERENCE BOARD, Inc.
NEW YORK
1929
        <pb n="5" />
        CoryricHT, 1929, BY
Nationa Inpustrial ConrErENCE Boarp, Inc.

September, 1929
749
        <pb n="6" />
        PREFACE

Jy weeks G attention is being focussed upon the fiveday
 week as a basis of plant operation or of employee
working schedules in American industry. This interest
has been stimulated by publicity given to somewhat spectacular
 individual instances of its recent adoption, and by the
spread of the shorter work week under labor union pressure
In special localities and occupations, such as the building and
garment trades.
At present, as this study shows, the extent of the five-day
week in American industry is insignificant in comparison
with the field of industrial operation as a whole, particularly
if highly unionized activities in special fields, and a few largescale
 instances like that of the Ford Motor Company, are set
apart. Nevertheless, sporadic and slight as the movement
still is in the manufacturing industries and mechanical
trades, its potential importance should not be under-estimated.
 Since, however, it is the responsibility of industrial
leadership to discern such issues and problems far in advance,
a study of the five-day week schedule in industry at this
‘ime does not seem premature.
The five-day week issue, at the present stage, is in part a
question of rearrangement of working hours and in part one
of reduction of the work period. But variance in purpose
and practice does not conceal the fact that the fundamental
objective and tendency in the movement is the reduction of
the weekly work period for employees, whether or not the
work period for machines is restricted or extended. In effect,
the five-day week is only the current form of the movement
toward progressively shorter working hours for labor. Since
this tendency is coupled generally, or in principle, with the
assumption that wages are to be maintained or increased, the
five-day week is, at bottom, also part of the general movement
 for higher wages.
The question of shorter working hours in this form has
thus become one of social economy and industrial technology.
        <pb n="7" />
        71

PREFACE

While the health of the worker under the greater speed and
mental strain of modern industrial operation is one factor
considered, the five-day week is also being advocated on
grounds of the increased productivity of modern machine
industry and industrial organization, and because of the need
for wider markets and greater public purchasing power for
the growing mass production of industry. High purchasing
power of the people can not, it is argued, be developed except
through higher wages. Therefore, it is contended that while
progressive mass production must make commodities available
 at progressively cheaper prices, the population’s ability
to purchase them in increasing measure must be sustained
through higher wage earnings; and, furthermore, unless the
people have more leisure they can not use more commodities,
and unless they can use them they will not want them.
Such reasoning is on the surface plausible and appealing,
but its simplicity and plausibility conceal a tangle of complex
and difficult problems. The industry of a great nation, like
the United States, is not one large factory but a vast collection
 of separate industries and establishments, in many ways
interdependent but also in constant competition, each with
its own problems of costs, prices and markets. No single
method of operation or philosophy of management, even
though it may be theoretically sound, is generally applicable.
In the course of time, individual adjustments and policies
may tend in the direction of one general practice, such as the
five-day week. Experience in this field, however, has not
been general or long enough, as yet, to enable anyone to say
with assurance that such practice, or the philosophy upon
which it is based, will be generally or universally valid from
the point of view of the national economic interest.
For the present, the task of industry is to follow the growth
of the five-day week movement and to analyze the fund of
concrete experience that has been, and is being, accumulated.
In this way, industry will be currently prepared for the exercise
 of sound judgment upon the question whenever it may
arise as an issue.
To assist in this task is the purpose of the present study,
which intends only to describe the present status of five-day
operation and the experience with it in American manufac-
        <pb n="8" />
        PREFACE

vii

turing industries where it has been applied. The study is
confined to a presentation of factual data, with no attempt to
enter upon a discussion of the general economic or social
aspects of the question, which at this stage can be matters
only of opinion and conjecture.
While this investigation was carried on, the National Industrial
 Conference Board had the benefit of the cooperation and
suggestions of its Advisory Committee on Industrial Relations,
 composed of men of special knowledge and broad experience
 in this field, to whom the Conference Board wishes
to express its indebtedness.
In the preparation of its studies, the National Industrial
Conference Board avails itself of the experience and judgment
 of the business executives who compose its membership,
and of recognized authorities in special fields, in addition to
the scientific knowledge and equipment of its Research Staff.
The publications thus finally represent the result of scientific
investigation and broad business experience, and the conclusions
 expressed therein are those of the Conference Board
as a body.
This volume is the result of an investigation conducted by
the Conference Board’s Research Staff, under the supervision
of the Staff Economic Council.

MacNnus W. ALEXANDER
President

New York City
September, 1929
        <pb n="9" />
        CONTENTS

Pace
INTRODUCTION . 1
I. Tue TreEND TOWARD SHORTER Working Hours . . 9
II. Tuk Score oF THE Five-Day Week Movement . . 15
Growth of Five-Day Week Operation in Industry . 17
Distribution by Industry of Plants Operating on Five-Day
 Week Schedule . . . . . . .
Labor Policy of Five-Day Week Plants ‘. + =
Location of Five-Day Week Plants . . .

[1I. Tue TecuNiQUE oF THE FIve-Davy WEEK ScHEDULE
Reasons for Adoption of the Five-Day Week .
The Length of the Working Day . . . . .
Limitations Imposed by State Statutes . . .
Adjustment of Wage Rates . .
Overtime Arrangements . . . .
Application of the Five-Day Schedule to Office Employees
 . .

[V. ExperieNCE WITH FIvE-Day WEEK OPERATION
Effect upon Production .
Operating Economies.
Punctuality and Attendance
Labor Turnover. . .
Other Advantages
Disadvantages and Objections ,
Attitude of Employees and Employers

19
22
24
25
25
28
31
35
36

37

40
40
0
1"

5
7
49
52

55
55
57
58
VI. GENERAL SUMMARY ew a a . . 61
Problems Involved in Five-Day Week Operation  . 62
Effects of the Five-Day Week on Operating Efficiency 64
Conclusion . . . , . . 66

AppenDIX—List of Representative Companies Operating on a
Regular Five-Day Work Week 67
        <pb n="10" />
        LIST OF TABLES

TABLE Pace
1. Distribution of Industrial Wage Earners according to
Number of Hours of Work per Week, 1909-1923 .  . 11
2. Number of Union Members, by Trades, Employed on
Five-Day Week Basis, October, 1928 . . . . 16
3. Year of Adoption of Five-Day Week in 262 American
Manufacturing Establishments su 2.
4. Distribution, by Industry and by Number and Sex of
Employees, of 270 Manufacturing Establishments
Operatingon Five-DayWeek . . . . . , 19
5. Distribution, by Size of Establishment, of 270 Manufacturing
 Establishments Operating on Five-Day Week . 22
6. Comparison of Weekly Hours of Work in 219 Establishments
 before and after Introduction of Five-Day Week. 29
7. Analysis of Weekly Working Schedules of 194 Establishments
 Operating-on Five-Day Week . . .
8. Distribution of 121 Companies with Regard to Policy of
Granting Five-Day Week to Office Force as well as to
Factory Employees . . ros x
9. Weekly Output under Five-Day Schedule Compared with
Output under Former Five-and-One-Half and Six-Day
Schedules, 127 Companies eee
J0. Hours of Night Work in 202 Manufacturing Establishments,
 Classified by Industry . .

18
        <pb n="11" />
        THE FIVE-DAY WEEK IN
MANUFACTURING INDUSTRIES

INTRODUCTION

HE question of the five-day week has several aspects
| that are commonly confused in current discussion and
must be sharply distinguished before there can be any
clear understanding of the problem.
In the first place, the five-day working schedule may involve
 a mere rearrangement or redistribution of weekly working
 hours, or a reduction in the weekly work time, or both.
[t 1s quite true that, in most cases where the five-day week is
applied, some reduction of weekly working hours is involved,
and that popular interest attaches chiefly to the shortening of
hours and increase of leisure with which the five-day movement
 is associated. Nevertheless, the five-day week can also
be considered on its merits as a redistribution of the weekly
hours of work, quite apart from any shortening of them that
may accompany such rearrangement.
Secondly, it should be noted that, whether attention is centered
 on the shortening or on the rearrangement of working
hours, the application of the five-day week may be considered
in one aspect as a purely practical administrative problem of
management, or in another aspect as a general question of
economic and social theory. An individual employer can
determine whether it is practicable or desirable for him to
operate his plant five days in the week, or to institute a fiveday
 working schedule for his employees even though the
plant is operated on a six-day basis. Practical considerations
of production costs, public psychology and morale of employees
 will govern him, and considerations of earnings, use
of leisure and the like, will sway workers in their attitude in
the matter. The consequences in each case will be of importance
 chiefly to the parties concerned. But, if the question is
whether the five-day week, either as a reduction or as a re-
        <pb n="12" />
        THE FIVE-DAY WEEK

arrangement of working hours, should or could be generally
applied in industry, by legislative enactment, by force of
collective agreement, or merely by pressure of popular opinion
 or general compliance with widening custom, it is more
difficult to arrive at a conclusive answer. Complex and difficult
 problems of economic and social welfare are at once
raised for employers, workers and the public, and it is impossible
 safely to settle these problems by appeal merely to
individual preference or experience.
This study is concerned primarily with the first-mentioned
aspect of the five-day week question, that is, the practical
administrative problem for the individual manufacturer, as
it is revealed in the experience and attitude of employers and
workers in cases where the five-day week has been applied.
The more general problems of economic and social theory
that are bound up in this question are outside the scope of
this inquiry. Such problems, of course, are inevitably raised
by the individual and specific experiences described in this
survey, but they can not be solved merely by reference to
them, and this study must not be taken as an attempt to do
so. In order, however, that the purpose and scope of this
study may be clearly understood, it is desirable at the outset
to review in some detail the questions that arise in connection
with this problem and to indicate specifically those with
which this survey is concerned.
Certain surface advantages of the five-day working schedule
 for both workers and employers are evident, but these
may or may not outweigh other, more far-reaching, considerations
 that are involved. It is probable that a considerable
majority of wage earners would prefer the concentration of
the work week into five days, even if this involved the slight
lengthening of the working hours in these five days to include
the hours to be lost on the sixth work day. The possession of
two entire days of freedom from work each week might well
stimulate additional effort during the other five days. But
if the hours of the sixth day, usually Saturday, were not
spread over the week, and if no wage adjustment was made
to compensate for the lost time, it is not so certain that the
shortened work week would be generally acceptable to the
workers.
        <pb n="13" />
        INTRODUCTION

On the other hand, for those employers whose plants
operate on a five-and-one-half day schedule, the five-day
schedule would permit the elimination of the last half-day,
which has frequently been economically unsatisfactory. In
addition to the fixed daily cost of putting the plant into
operation, which on a short Saturday must be distributed
over only a half-day’s production, efficiency has usually been
found to be subnormal on the short day. The worker's
thoughts tend to wander to plans for the week-end, the rate
of absenteeism is high, and discipline is generally lax. From
this angle a five-day schedule may appear attractive to
many employers.
In any consideration of the practicability of the five-day
week, questions of output and costs are naturally uppermost
in the minds of employers. Can the output usually obtained
in a week of a given number of hours spread over five and onehalf
 or six days be consistently obtained from the same number
 of hours concentrated into five days? This resolves itself
into a question of relative efficiency during these extra hours
when, on the one hand, they are distributed over the week,
and on the other are combined to form a separate work day.
Lf the hours of the sixth day are dropped altogether, can the
former five-and-one-half or six-day production be equalled or
closely approached inf" the shorter five-day week through
greater efficiency and application? The wage payment system
 in force is likely to be an important factor in this consideration.
 A piece-work or other incentive wage plan may
secure as much output in five days as was formerly produced
in five and one-half or even six days, because of the employees’
 desire not to suffer a loss in earnings. Under a timework
 wage plan this is less likely to be the case. If the sixth
work day is dropped altogether, will a readjustment in wage
rates be necessary to permit earnings of weekly wages equal
to those earned under the longer schedule? When it is necessary
 to work on the sixth day shall such work be compensated
at regular rates or be considered overtime work? Whether
wage rates be adjusted to prevent any loss of earning power
from the shortened work week, or such a loss be partially provided
 for, or the wage schedules be maintained unchanged,
are questions of policy for the individual plant management.
        <pb n="14" />
        THE FIVE-DAY WEEK

These more direct questions involved in considering the
practicability of a five-day working schedule are likely to lead
far afield into more conjectural problems of economics.
Would a general adoption of the five-day week without
maintenance of the full working time result in a reduction in
our national manufacturing output, because of inability of
improved Processing to compensate for the productive time
lost? If such a loss in volume of production were in prospect,
would such a condition be desirable? It is generally conceded
 that, except for brief periods, the productive capacity
of the country’s manufacturing facilities is seldom approached,
 and is even more rarely taxed, and yet the capacity
of domestic and foreign markets to absorb industry’s present
output is, in general, all too easily satisfied. Therefore,
would such a natural curtailment of output be advantageous?
In case such a curtailment became general, would the price
structure be disturbed? In other words, could industry produce
 as economically on the shorter schedule as on the longer,
or would commodity prices rise because of higher unit production
 costs? In the event that higher prices and lower
earnings followed the reduction jn working hours, would de.
mand for manufactured products be maintained? Or would
the extra day of leisure tend to stimulate the purchase and
consumption of manufactured commodities?
Whatever the direct result of 2 widespread adoption of the
five-day working schedule might be upon the manufacturing
industries immediately affected, the more indirect, but not
less important, effects upon collateral industries should not
be lost sight of. Economic activities in modern society are
inseparably interrelated and the reduction or rearrangement
of working schedules to a five-day basis in certain industries
might be expected to affect in some measure other industries
which for one reason or another find such a change impracticable.
 Questions of special interest arise in connection with
the effect of the application of the five-day week in manufac.
turing industries upon other industries that supply them cer.
tain services, such as light, power and transportation,
The electric light and power industry is under the neces.
sity of maintaining Producing facilities capable of meeting
the peak demand for current no matter how small a portion
        <pb n="15" />
        INTRODUCTION

of the day or week may be covered by this peak demand.
Capital investment in production facilities in the industry is,
therefore, regulated by maximum requirement. This problem
 of peak load has in late years been intensified as a result
of the gradual but progressive shortening of the working day.
If, in the near future, work on Saturday should become the
exception instead of the rule, the industrial demand for power
on Saturday would practically cease, leaving the power companies
 with relatively idle equipment on two of the seven
days in each week. In addition, if part of the former Saturday
 working hours were retained and spread over the preceding
 five days of the week, the length of these working days
would be increased, a situation that at certain times of the
year would tend to bring about a crossing of the power load
and the light load, thereby perhaps creating a new maximum
requirement for current. Therefore, in the event of a widespread
 adoption of five-day operation, power companies apparently
 face a dilemma; first, with a greater concentration
of demand resulting in a new maximum and the need for additional
 capital investment to provide facilities for meeting this
maximum demand, and second, at the same time a longer
period of comparative idleness for equipment with fixed
charges going on and little revenue coming in.
While these problems may be considered as primarily
affecting the public utility companies themselves, they may
have a much wider bearing. These companies might find the
loss of revenue on Saturday sufficiently serious, or the capital
cost of new facilities enough of a strain upon their resources,
to make the maintenance of present power rates impossible.
In the event of an increase in these rates, manufacturing industries
 would feel the direct effect of problems which their
adoption of the five-day schedule had created.
Such questions, however, are based upon the assumption
that the five-day week would be introduced generally in a
relatively short period of time, which is very doubtful, and
that such application of the five-day week would mean that
plant operation would necessarily be restricted to five-days
per week or to the same five days for all establishments. Asa
matter of fact, any increase in five-day operation in manufacturing
 industries is likely to be so gradual that, judging
        <pb n="16" />
        ow

THE FIVE-DAY WEEK

by the past, technical improvements and managerial efficiency
 will, it may be hoped, discover solutions for these
difficulties in advance of their development into acute problems.

Other questions of a social character project themselves
into the five-day week discussion. If the attempt is made to
accomplish in five days what was formerly accomplished in
five and one-half or six days, what will be the effect upon
fatigue and health of workers? The pace of present-day
manufacturing is not leisurely. Even where physical effort
is reduced, mental concentration is likely to be intensified.
If the hours of the sixth day are spread over the week, or the
attempt is made in five unlengthened days to equal the
former five-and-a-half or six-day output, how will this additional
 application affect the worker? Will the extra day of
relaxation completely compensate for any added strain, or
will the accelerated pace of the five days tend to exhaust the
worker’s energy prematurely? It is possible that the tendency
 toward fewer working days is a natural sequel to the
intensification of modern business and industrial life. It may
be argued that, if work is to be performed under constantly
increasing pressure, allowance must be made for a greater
amount of relaxation and rest to compensate. It may be
that overnight recuperation will not be adequate and that
provision will have to be made for a more extended period of
rest at the end of each week.
Will the shortened work week, by creating more jobs, tend
to offset the apparently decreased demand for human labor,
caused by increased mechanization of productive processes?
Such a view is given color by the recent action of the Ford
Motor Company, a leading exponent of the five-day week, in
resuming six-day operation without sacrificing the principle
of the five-day week for the workers. Additional men have
been employed, and by means of a series of overlapping shifts
the plant will be operated six days, although individual employees
 will work only five days a week.
Still broader and more complex issues are met when questions
 of the social value of additional leisure are raised. Itis
recognized that increased leisure has come to have a definite
economic value under the present organization of industry,
        <pb n="17" />
        INTRODUCTION

in that it permits for some industries a better balancing of
production and consumption. Commodities tend to be overproduced
 and to lose part of their market value if consumers,
hough able to buy them, do not have time to use them. But
many persons question whether the extension of leisure is
justifiable merely on such grounds, and ask whether additional
 leisure will be used in ways beneficial to the cultural
interests of society. Employers, as such, have perhaps no
direct interest in these latter questions, yet as citizens they
are bound to be affected by them.
Enough has already been said to indicate the diversity of
questions raised by the five-day week proposal, but this very
complexity should stimulate rather than diminish interest in
the subject. In the short space of a few years, the five-day
week has passed from the status of a vague future possibility
to that of an accomplished fact in several hundred establishments,
 and has become a live question in many others. Like
many other phases of administrative policy, its merit can not
be decided once and for all. In each individual establishment
 these and other questions will have to be considered
when determining the advisability of a five-day working
schedule.
After all, the movement toward shorter working hours is
not independent and isolated from other factors involved in
economic development. It is but one of the related tendencies
 which, to be sound, must move in conformity with general
 economic law and progress. To attempt to accelerate a
single constituent of this progress arbitrarily is to invite
conomic maladjustment, which is more likely to retard than
‘0 expedite orderly advance toward the desired goal.
The immediate issues involved in five-day week operation
are comparatively simple. When hours of work per week
remain the same under the shorter as under the longer work
week, no important administrative questions arise. But
when weekly hours are reduced, the important problem of
maintaining production and unit wage costs comes at once to
the front. If, immediately following the change to the fiveday
 schedule, the production and wage cost situation should
prove unsatisfactory, is there a likelihood that conditions
could be corrected through further improvement in methods
        <pb n="18" />
        THE FIVE-DAY WEEK

of management or in processing? Decisions of management
upon the immediate practicability of the five-day schedule
will be strongly influenced by its attitude in regard to these
points. While the five-day week must still be considered
more as an experiment than as an established and general
policy, it is undoubtedly receiving serious consideration by
business executives, not as an abstract proposition but as a
definite practical question for their individual enterprises.
A well-founded appraisal of the practicability of the fiveday
 week as a general working schedule has been made difficult
 in the past by the lack of data upon which sound judgment
 could be based. Favorable or unfavorable attitude toward
 the question has heretofore rested largely upon personal
prejudice or the accepted school of economic thought, rather
than upon objectively analyzed evidence. The National Industrial
 Conference Board undertook this study of the fiveday
 week, not in an attempt in any way to pass final judgment
 upon this work arrangement, but to take account of it
as one possible schedule of industrial operation and to assemble
 available data that would show the extent of its use, the
reasons for its adoption, the character of the industries in
which it is found, the technique of its operation and its
effectiveness as a regular working schedule.
In interpreting the results of the investigation it is important
 to note at the outset: first, that the total number of
employees found to be on a regular five-day week schedule,
even including the huge employment of the Ford Motor
Company, constitutes only about 2.6% of the total number
of wage earners in manufacturing in the United States; second,
 that most of the instances of five-day week operation
that were found and studied are confined to certain industries
in which, as a rule, labor is highly organized; and third, that
most progress in the spread of the five-day week has probably
been in the highly unionized construction industry, which is
not treated in detail in this study since the problems involved
 are radically different from those in manufacturing
industries.
        <pb n="19" />
        CHAPTER 1
THE TREND TOWARD SHORTER WORKING
HOURS

IE HAS already been emphasized that the adoption of a
five-day work week in a manufacturing plant does not
necessarily mean a reduction of the weekly working time
of employees, but may consist entirely, or in part, of a rearrangement
 of the work schedule. Nevertheless, because of
those instances in which it does mean a reduction of working
time, the five-day week is quite commonly taken to be a part
of a general movement in industry toward shorter working
hours. It will therefore be useful to review briefly the available
 material regarding the trend toward shorter work time,
and the extent to which that trend has taken effect in the
various occupations.
Wide-spread and coordinated action aimed at reduction of
hours of work in the United States dates back only to about
1850. Originally, little or no distinction was made between
the working hours of industrial employees and of agricultural
workers. The working schedule of the farmer, from sunrise
to dusk, was generally accepted, although this resulted in a
variable number of hours per day according to the season.
Occasional efforts of urban employees to secure shorter hours
were generally not effective because of lack of the power to
enforce agreements made. The movement for shorter work
hours first received governmental recognition, and thereby
assumed a political as well as a social aspect, when President
Van Buren issued an executive order, in 1840, establishing a
ten-hour day in all government-operated industries. Social
reformers joined the workers in their demand for the wider
extension of this arrangement, and during the next two
decades several state legislatures enacted statutes that embodied
 similar provisions. These laws were not effective,
however, because of the ease with which they could be evaded
and because administrative machinery for enforcing them
was generally lacking.
        <pb n="20" />
        )

THE FIVE-DAY WEEK

During the early fifties of the nineteenth century the ascendancy
 of labor unions changed the philosophy of the movement
 for shorter hours of work. Fearing that legislative action
might weaken their organization and power, union leaders
discouraged attempts to standardize working hours by legislation.
 They preferred to extend the influence of the unions
by securing reduction of hours in individual industries or
establishments through strikes or trade agreements. Also,
the social arguments for shorter hours—to protect the health
of workers and to give them more leisure—were for the time
largely abandoned in favor of the argument that shorter
hours would provide work for a greater number of wage
earners. For a period legislative action ceased, and it was not
until nearly three decades after President Van Buren’s order
that legislatures again turned their attention to the question
of restricting hours of work. The first enforceable law limiting
 hours of work applied only to women and was passed by
the Massachusetts legislature in 1879. It proved effective
because by that time state bureaus and factory inspection
agencies, to enforce its provisions, had been organized.
Thereafter, the movement for legislative restriction of hours
of work of women steadily spread, until in 1927 only five
states! were without such a law.
Statutory limitations upon the hours that women may
work now range from eight to eleven hours per day in manufacturing
 industries. Only six of the states which have such
statutes fail to limit the hours of work per week. In only
five states is the legal maximum of hours of work per day for
women in excess of ten hours. Some states, in which seasonal
 industries are important factors, make special provisions
 for permissible overtime at certain seasons, or provide
a fixed overtime allowance that may be distributed throughout
 the year at the employer’s option.
The constitutionality of laws restricting the hours of work
of women was upheld in 1908 by the Supreme Court of the
United States in the famous case of Mueller v. Oregon?
which affirmed the right of the state to exercise its police
power in this manner for the protection of the health of
1 Alabama, Florida, Indiana, Iowa and West Virginia.
Y Mueller 0. Oregon, 208 U. S, 412; 28 Sup. Ct. 324 (1908).
        <pb n="21" />
        TREND TOWARD SHORTER WORKING HOURS 11

women. This decision was reinforced by a later one,! bearing
on the California statute regulating women’s hours of work,
with the result that the constitutionality of such legislation
with respect to women and minors has been definitely established.
 On the other hand, little headway has been made in
restricting by statute the hours of work of men in private
enterprises, on account of the general view that such action
would abridge the individual’s right of contract. Exceptions
to this general rule have been made in case of enterprises
such as railroad operation, where the safety of others may be
endangered by excessive fatigue of the responsible operators.
Most progress, however, in the direction of shorter working
hours has come as a result of collective bargaining or individaal
 agreements between management and the working force.
At its 1884 convention, the American Federation of Labor
set May 1, 1886, as the date for the general establishment of
the eight-hour day, but although gains were made at that
time and have been made since, manufacturing industry
generally has not yet adopted that work schedule. That the
trend, however, has been steadily toward a week of fewer work
hours is evident from the data compiled by the United States
Census of Manufactures. which are summarized in Table 1.

Tare 1: DistriButioN oF INpusTrRIAL WaGE EARNERS ACCORDing
 To Numer oF Hours or Work Per WEEK, 1909-1923
(Source: U. S. Bureau of the Census)

Prevailing Total Number of Workers : Per Cent Distribution
Hours of a — _— i ——
per isk 1923 | 10m wo | 1014 | 1909 | 1923 | 1921 1919 1 1914 | 1909
All groups A 9,041,311 17,023,685(6,615,046 100.0/100.0' 100.0 | 100.0 [100.0
#4 and
under. .| 865,687 954,908 1,107,991
Between 11.8! 79
44 and 48 95601 203,111) CIE
18. ......12,780,803|2,334,256
Between |
48 and 54{1,925,029 1,262,071)
S4.......| 768,524] 542,581
Between
S54 and 60(1,231,521| 871,961
60. ......| 642.837] 516,520
Over 60..1 168.0641 171,162

L Miller vo. Wilson, 236 U. S. 373; 35 Sup. Ct. 342 (1915).
        <pb n="22" />
        THE FIVE-DAY WEEK
Of more than six and one-half million wage earners who
were employed in manufacturing in the United ‘States in
1909, only 7.9% were found in establishments operating
forty-eight hours or less per week, but by 1923, the latest date
for which the Bureau of the Census has compiled figures of
this nature, 46.19 of the eight and three-fourths million
workers fell within this group. On the other hand, 69.49, of
the industrial wage earners worked in 1909 longer than
fifty-four hours per week, but the proportion falling in this
group had in 1923 been reduced to 23.2%. Details of the distribution
 of wage earners according to the prevailing hours
of labor per week from 1909 to 1923 are given in Table 1.
Similar testimony is afforded by the available figures regarding
 the average number of hours per week. For example,
in its monthly studies concerning wages, employment and
hours of work in twenty-five manufacturing industries, the
National Industrial Conference Board found that in 1928
the average normal work week in these industries was between
 forty-nine and fifty hours, while in 1914 this average
was fifty-five hours. This gradual decline in the average
hours of work per week noted since 1914 is part and parcel of
a general movement in American industry which has been
going on for a number of years. Continuous figures on the
same basis are not available, but it is interesting to note that
an inquiry conducted by the United States Bureau of Labor
Statistics for the years 1890 to 1906 shows a similar trend.
Based on the average of the period 1890 to 1899, the index
number representing hours per week stood in 1890 at 100.7
and from that year there was an almost uninterrupted decline
to a minimum of 95.4 in 1906.
It is interesting to note that the curtailment of the hours
of work has not been accompanied by any reduction in the
earnings of the workers. On the contrary, in spite of occasional
 setbacks, the trend of wages has been upward during
the past century and the earnings of the workers today are
often many times what they were early in the nineteenth
century, although working time has been substantially reduced.
 The inquiries of the National Industrial Conference
Board, to which reference has been made, show, for example,
that the average weekly earnings of all wage earners in manu-
        <pb n="23" />
        TREND TOWARD SHORTER WORKING HOURS 13

facturing industry in July, 1929, were 1249, above the level
of July, 1914, while average hourly earnings were 135%
above the same level. Since in the same interval the cost
of living for the industrial wage earners increased only
61.6% over the 1914 level, it is clear that there has been a
substantial increase in the standard of living of industrial
wage earners. If it be objected that these years were exceptional
 and were influenced overwhelmingly by the extraordinary
 conditions which were the outgrowth of the war,
reference may be made once more to the earlier inquiry cited
in a preceding paragraph. According to its findings, there
was between 1890 and 1906 an increase of 24% in hourly
wages and an advance of 17% in full-time weekly earnings.
Various political and social organizations, as well as labor
bodies, are constantly advocating progressive reductions in
working hours. The maximum that they view at present
with any tolerance is the 48-hour week, and in some trades
they have made the 44-hour and even the 40-hour week the
immediate goal. Success in one state or in one industry
serves only to stimulate greater effort towards further reduction
 there and elsewhere. Economic, business or technical
conditions that may have a considerable bearing upon the
practicability of reductions in working schedules are usually
dismissed without serious consideration. Suggestions that
too frequent and stringent regulation handicaps desirable
business growth and natural expansion, and even forces some
establishments to move from states with such regulative legislation
 and prevents others from settling there, are met with
the rejoinder that a state is better off without industries that
zan not observe humane standards for their workers.
On the other hand, many view the progressive reduction
in working hours with disfavor. They resent the interference
 of labor and other outside organizations in matters of
plant administration and are generally opposed to legislative
regulation of internal industrial operation. They maintain
“hat hours of work should be a matter of free individual contract
 between employer and employee.
Between these two views is that of the great majority of
persons who approve the principle of shorter hours of work
when its application is feasible and justified in the light of
        <pb n="24" />
        THE FIVE-DAY WEEK

economic conditions, but believe that such reductions as are
contemplated should be accomplished gradually and without
disturbing the economic balance. They recognize that such
factors as technical processes and competition are determining
 issues, and are satisfied that, apart from exceptional
cases, working periods today are not so long as generally to
constitute a menace to health. But they also recognize as
plausible, if not actually proved, the argument that the intensity
 and concentration of effort demanded by modern
industrial operation may cause greater mental, if not greater
physical, fatigue than formerly, and that this factor should
be taken into account in deciding upon working schedules.
A new phase of the hours of work question has been
reached with the definite advent of the five-day week schedule
 in some industrial establishments, including a few of outstanding
 importance. The progress of the adoption of the
five-day week in industry will be followed closely both by
advocates of fewer hours of work and by employers who may
see it either as an answer to certain vexing administrative
problems or as a source of new problems.
        <pb n="25" />
        CHAPTER II
THE SCOPE OF THE FIVE-DAY WEEK MOVEMENT
I) er knowledge with respect to the extent of the
five-day week operation in American industry is very
scant. It is generally known that a few prominent
industrial enterprises have adopted this work schedule, because
 considerable publicity has attached to the announcements
 of its inauguration. It is also known that certain
local building trades have secured its adoption. Beyond such
general impressions, very little authoritative information on
the subject has been available. Hence this study, in which
the Conference Board was concerned mainly with the adoption
 of five-day week operation as a definite policy. Cases of
temporary five-day operation, as during the summer months
or during periods of slack business, or cases in which there was
a definite intention ultimately to revert to five-and-one-half
or six-day operation, were also considered with the instances
of the continuous five-day week, but they are reported
separately in this volume.
Moreover, this specific investigation has been confined to
manufacturing establishments, but for purposes of estimating
the spread of the five-day week movement in industry, other
occupations should also be considered. Thus, in the report
of its executive council, presented at its annual convention in
New Orleans, November 19, 1928, the American Federation
of Labor claims that 164,479 of its members are working
ander five-day, 40-hour-a-week agreements, as well as 550
office workers, distributed among twenty international
unions. However, an examination of these data, here reproduced
 in Table 2, shows that approximately 70%, of the total
are employed in five building trades—those of bricklayers,
carpenters, electrical workers, painters and plasterers; and
that the painters’ union alone contributes 38% of the total.
15
        <pb n="26" />
        ~ THE FIVE-DAY WEEK
TaBLe 2: NumBerR oF Union MEMBERS, BY TRADES, Em-PLOYED
 ON Five-Day Week Basis, OcToBER, 1928
(Source: American Federation of Labor)

Internationzl Union

Number of Locals I Nyubgeet

202
6,156
9.740
2,900
5,100
13.095
1,3802
1,033
15,850
5,000
2,141
34
52,896
11,530
"307
724
36
65
750
3,540
. 164,479
1 The fur workers in thirteen locals, having a combined membership of 11,580,
allow overtime during four months of the year, from September 15 to December 15,
week days, three hours; Saturday, four hours. One local permits overtime in
emergency cases only. The New York agreement calls for four hours’ work on
Saturday in these months.
2 Of these, one local with eighty-two members has the five-day week the year
round, the others have it for eight or nine months. The granite cutters also have
the five-day week for from three to six months in forty locals having a combined
membership of 3,406.
8 This includes four joint boards of several locals.
4 In nicht work only.

Agbestos workers ...... .
Bricklayers. ........... ‘e
CArPRnIerS. pss s ss us wmnnn ras _.
Cloth hat and cap workers. ..............
Electrical workers ........coeivvinnninenn.n.
Fur workers ............. .
Granite cutters . ....... eerie ae
Hod-carriers ..ooovveinnniieneninnnannencns
Garment workers—ladies’ .............. ..
Garment workers—united ..................
Lathers........... ;
{ .aundry workers , . .
Painters. ............ Ve
Plasterers. .......... ‘
Plumbers................... 3h 3 nA §
Sheet metal workers. ......... ie
SLONE-CULLErS «vv vvvvevnnnranrananns .
Tailors. ...oovvereenenninnnennns .
Typographical workers . ....
Upholsterers. ....

In its investigation covering manufacturing industries, the
Conference Board found 270 industrial establishments that
were in 1928 operating on a regular five-day week schedule,
and employed 216,921 workers on this basis. It is doubtful
that many of the employees included in the American Federation
 of Labor statement are duplicated in the Conference
Board’s tabulation, for the reason that, in the main, quite
different occupations are covered. The known point of
duplication between the two studies is in the garment industries,
 but union shops in these industries accounted for only
about 5,500 of the employees covered by the Conference
Board’s study.
        <pb n="27" />
        SCOPE OF THE FIVE-DAY WEEK MOVEMENT 17

Taking into account the figures of both the American Federation
 of Labor and the Conference Board, but eliminating
the estimated fifty-five hundred duplication, it would appear
that 376,450 employees in manufacturing and building operations
 were, at the close of 1928, working on a five-day week
basis, or, allowing for instances of five-day week operation
herein not recorded, about 400,000. This figure for the end of
1928 was substantially exceeded when the agreement reached
between the Building Trades Employers’ Association of New
York City and the Building Trades Council on May 4, 1929,
went into effect August 24, 1929, and all building trades labor
under the jurisdiction of these bodies was granted the fiveday
 week, together with a 10% increase in wage schedule to
compensate for the wage loss due to reduced working time. It
was estimated that this placed an additional 125,000 to 150,-000
 workers on the five-day week basis. Agreements with
building trades locals in other cities indicate that the total
figure will be still further increased by the close of 1929.

Growrr oF Five-Day Week OPERATION IN INDUSTRY
{t is noteworthy that several instances of five-day week
operation date back td'a period when its adoption as a regular
 working schedule was not given much serious consideration
 by industry in general. The earliest instance of the
shorter schedule discovered in the Conference Board's investigation
 was reported by a New England spinning mill,
which started in business in 1908 on a five-day basis. In this
case, the company reports, the majority of the management
and the employees were of the Jewish faith, and a desire to
observe the Hebrew Sabbath was the main reason for deciding
 to eliminate all Saturday work. At the same time, the
management insisted that production must not suffer. Consequently,
 the weekly hours then current in the industry were
maintained and spread over the five working days of the
week. The plan has operated without interruption for
twenty years, with satisfaction to both management and employees,
 and it is still in effect.
During the decade beginning with 1908, very few industrial
 establishments adopted the regular five-day schedule.
The total of eleven plants adopting the shorter work week in
        <pb n="28" />
        18

THE FIVE-DAY WEEK

this decade is in marked contrast to the total of 251 in the
following decade, as is shown by Table 3. A more definite
trend toward the adoption of the five-day week appears to
date from 1918. Apparently, the movement has gradually
been gaining momentum, although this momentum is of relative
 rather than absolute importance, since the number
operating on the five-day schedule is still insignificant in
comparison with the total number of manufacturing establishments
 in the United States.

TABLE 3: YEAR oF AporrioN of Five-Day Week in 262
AMERICAN MANUFACTURING ESTABLISHMENTS
(Source: National Industrial Conference Board)

Number of
Establishments

yp

Number of
Establishments

INQ

)
210
N11
312
M2
114

F
Y

a

i

]

There seems to be little connection between general business
 conditions in a given year and the spread of five-day
week operation during that period. On the one hand, in
1921, which was in the manufacturing industries probably
the most unsatisfactory year in more than a decade, the
number of plants adopting the five-day week was double
that in any preceding year. This would suggest that during
a period of production curtailment the shorter work week
was adopted either from economic necessity or as an experiment,
 and that satisfactory experience with it, or inertia, or
difficulty in changing back to a longer work schedule had led
to its continuance as a permanent policy. On the other hand,
the year in which the largest number of plants introduced the
five-day schedule was 1925, which with 1926 was a highly
satisfactory period of industrial operation. Thus, business
conditions appear to have little direct effect upon the spread
of the five-day week. A more reasonable explanation of the
        <pb n="29" />
        SCOPE OF THE FIVE-DAY WEEK MOVEMENT 19

peaks in certain years may be found in the fact that union
agreements, such as those in the cloth hat and cap industry
and the garment industry, became effective in those years.

DisTRIBUTION BY INDUSTRY OF PLANTS OPERATING ON
Five-Day WEEK SCHEDULE

The distribution by industry of plants operating on a fivejay
 week schedule gives an indication of its applicability to
different types of process and reveals the extent of its adoption
 in the various industries. Table 4 shows this distribution
 by industry and also the size and sex composition of the
working forces affected.

TABLE 4: DISTRIBUTION, BY INDUSTRY AND BY NUMBER
AND Sex or EMPLOYEES, oF 270 MANUFACTUR-NG
 EsTaBLISHMENTS OPERATING
oN Five-Day WEEK
(Source: National Industrial Conference Board)

Industry

Cloth hats and caps...
[.adies’ dresses. ......
Men's clothing. ......
Other garments.......
Printing, publishing
and lithographing. . .,
Textiles. ............
Paper products. ......
futomobile and aircraft
 equipment. . . .
Miscellaneous metal
products...........
Unclassified. .........
Total. .....

1 Workers Employed. Sex of Workers
Number —_— re - — re
| | On EveDay ry Employeesl 00 cP
lish- Pp» Total — — Rs ——ime
nents Number | 2 Male | Femate: Male Female
1,440(100.0] 897] 543] 897] 543
1,694; 99.6 659] 1,041 6531 1,041
7,870] 96.5! 4,266] 3,887 4,191, 3,679
6141100.0 1381 476 138] 476

8,827] 8,301] 94.01 7,435)
3,564] 2,504] 98.3 2,115)
4920) 4789] 97.3 4,793:
77 9201177 220{100.0175,377!
|e sa omel a0a3l ssqf ages) 496
oib2 61251 374 3361 2631 3,532] 2,593
270 [218.2191216,921| 99.4}204,274113,9451203,421113,500

1,392] 7,023
1,449] 2,082
129) 4,660]
1,843/175,377]

In point of number of establishments operating on the fivejay
 schedule, the garment industries outnumber all others
combined, and account for practically 60% of the total. But
the combined employment in these garment plants amounted
to only about 5% of the total number of wage earners employed
 in the 270 establishments found to be operating on a
        <pb n="30" />
        20

THE FIVE-DAY WEEK

five-day week, and to only 289, of the total wage earners if
we exclude the employment of the Ford Motor Company.
Thus, while the five-day week has apparently made greater
headway in the garment industries than in others, neither the
actual number of wage earners affected nor the proportion of
this number to the total number of wage earners in American
industry under the five-day week plan is particularly significant.

Another industry in which the five-day week has made considerable
 progress 1s the printing and lithographing industry,
but as will be seen later, there are special conditions making
the five-day week schedule particularly applicable in this industry.
 A comparatively small number of establishments in
the textiles, paper products and metal working industries
were found to operate on this schedule. Other industries in
which one or more plants were found to be using the five-day
schedule of operation include those which manufacture the
following articles:

Aeronautical instruments
Aircraft engines
Automobiles
Automotive equipment
Carpets
Castings
Chewing gum
Copper products
Cotton spinning and manufacturing
Cotton dyeing, bleaching and finishing
Cutlery and shoe tools.
Felt
General and special machines
Goggles
Guns and rifles
Heat indicators
Heating and ventilating apparatus
Insulated wire and cables
Jewelry
Ladies’ hand bags

Metal tubing and hose
Noodles
Paper
Paper board
Paper cartons
Pencils
Pharmaceuticals
Pressed steel
Rubber goods
Salad dressing and spices
Shoes
Smoking tobacco
Soap
Sporting goods
Steel plate fabricating
Surface abrasives
Turkish towels
Valves
Water and oil meters
Woolens

While the variety of industries that have found the fiveday
 schedule feasible is rather impressive at first glance, it
does not prove that this schedule is universally, or even gen-
        <pb n="31" />
        SCOPE OF THE FIVE-DAY WEEK MOVEMENT 21

rally, practicable in operation. The majority of these indus-‘ries
 are non-continuous in character, and length of working
time is not regulated by the manufacturing process. Consequently,
 a few hours can be dropped from the schedule or
transferred from Saturday to other days of the week without
interfering materially with the production routine. Ina continuous-process
 industry, however, the problem is quite different.
 There, the production process requires twenty-four
hour continuous operation each working day until the close
at the end of the week, usually on Saturday night, unless
operation on Sundays is also imperative. For such a consinuous-process
 plant to adopt the five-day schedule would
mean the dropping of an entire day in each week, or a sixth of
the week’s productive time, unless a supplementary force is
hired to permit six-day plant operation with five-day employment
 of the workers. Thus, while five-day operation in continuous-process
 industries was found in a few plants, it is not
likely to be anything but the exception to the prevailing
practice in these industries for some time.
From Table 4 it is evident that, even in establishments
that are definitely on the five-day weekly schedule, a small
percentage of employees works a longer schedule. This percentage
 ranges from less than 19, in the women’s clothing
industry to 6% in the printing and lithographing shops.
These employees, who constitute less than 1% of the total
employment in all plants covered, are chiefly maintenance
and repair crews and shippers, who can often work to better
advantage when the plant is not in operation.
The sex composition of the total working force in these
five-day week plants is arresting because of the apparent
preponderance of male wage earners. While the sex distribution
 of wage earners in manufacturing industries generally is
approximately in the ratio of one woman to four men, it 1s
shown in Table 4 that in these five-day week plants the ratio
is approximately one woman to sixteen men. Closer analysis,
however, indicates that this proportion results from the
heavy weighting given to the totals by the figures from the
Ford Motor Company, which employs men almost exclusively.
 If figures from this company are omitted, the ratio
of women to men in the remaining companies approximates
        <pb n="32" />
        29

THE FIVE-DAY WEEK

one to three and one-half, which conforms quite closely to
the general industrial average.
The average size of the plants covered is, likewise, strongly
influenced by the figures from the Ford Motor Company.
Thus, the entire 270 establishments studied reported a total
of 218,219 employees, or an average employment of 808,
whereas if data for the Ford Motor Company were excluded
the average employment in the remaining plants would
amount to 155, which indicates that most progress in adopting
 the five-day week schedule has been made in establishments
 in the small-plant category. In fact, as shown in
Table 5, more than two-thirds of the companies covered employed
 fewer than one hundred wage earners, and 919, of the
plants had an employment of 500 or less. The average size of
plants operating on a five-day schedule is, of course, strongly
influenced by the large proportion of establishments in the
garment trades, where employments of comparatively few
wage earners are the rule. Several of such plants included in
this study employed fewer than ten wage earners.
TABLE 5: DISTRIBUTION, BY SIZE OF ESTABLISHMENT, oF 270
MANUFACTURING ESTABLISHMENTS OPERATING
oN Five-Day Week
(Source: National Industrial Conference Board)
Employees
Number | Per Cent

Less than!
100 to 2:
251 to SC
501 to 75
751 to 100
1001 to 2000
Over 2001

Wo

Tote

ren
27
nA

£46
-3.6
fq
41

5,356
6,237
6,484
7.377
ang

1.5 02,93
270 1 100.0 | 218,219

2.4
2.8
3.0
34
0.8
3.7
83.8
100.0

Lasor Povricy oF Five-Day Week PLanTs
Management policy with regard to organized labor in
establishments operating five days a week assumes considerable
 importance when it is realized that the factor of
free-will adoption of the shorter schedule or its adoption
under compulsion of the labor union has in many cases
        <pb n="33" />
        SCOPE OF THE FIVE-DAY WEEK MOVEMENT 23

played almost a deciding part in determining the attitude
of employers toward the five-day schedule.
Of the 270 establishments found to be on a permanent
five-day week schedule, 57.3% were closed union shops;
919, of these closed shops were in the garment industries.
The entire employment in the union shops covered was
only 3.1% of the combined employment of the 270 companies
 covered, and only 16.4% of the total employment
when the Ford Motor Company is excluded. Consequently,
although slightly over half of the establishments found to be
on the five-day week basis were working under union agreements,
 the wage earners affected constituted only a small
percentage of the total number of employees known to be
working on the shorter schedule.
Even in the garment industries, in which 86.29, of the
five-day week establishments are closed union shops, the
remaining 13.8% of open shops were found to employ more
workers than the combined total of the much larger number
of union shops. Particularly in the men’s clothing branch
of the garment industries, with its outstanding companies
of considerable size and independent of union control, the
employment of one “open-shop company outnumbers_the
aggregate working force of many small union shops. It is
the adoption of the five-day week by certain of these large
open-shop companies that has brought about the situation
indicated.
It is also interesting to note that while the printing and
lithographing industry is quite widely unionized, particalarly
 in the large urban centers, thirty of the thirty-six
establishments in this industry that reported the adoption
of the five-day week were not union establishments. Furthermore,
 the few union shops were small in size and employed
 together only 4.6% of the wage earners in this industry
 reported as working on the shorter weekly schedule.
Whether the emphasis should be placed upon the number
of establishments on the five-day week or on the number of
wage earners affected depends upon the point of view. The
number of establishments represents the separate instances
of the adoption of this working schedule, the number of
cases where management and working force or management
        <pb n="34" />
        4

THE FIVE-DAY WEEK

and labor union have adopted this policy voluntarily or under
compulsion. As such, each case is significant. But it is
difficult to find any comparability between a small clothing
shop in New York City employing seven workers and the
Ford Motor Company employing nearly 200,000. Each
represents one instance of the adoption of the five-day week
by a manufacturing establishment, but there the likeness
stops. In contrast, the number of workers affected by the
adoption of the five-day schedule indicates in a general way
the proportion of the nation’s, or of an individual industry’s,
man-power that is committed to this schedule of work. It
appears to offer a more significant indication of the spread
of the five-day principle and of the extent to which it has
become effective as a working schedule.
On the basis of the number of establishments on a five.
day week schedule, labor policy appears to be an important
factor and organized labor seems to have exerted consider.
able influence in bringing about the adoption of this schedule.
 But on the basis of the relative size and importance of
closed-union and open-shop plants operating under the
shorter schedule, as measured by the number of workers
affected, the labor union influence loses its significance and
becomes a relatively unimportant factor in accounting for
the spread of five-day week operation.

Location or Five-Day Week PLanTs
The Conference Board’s study clearly reveals that the
five-day week in industrial establishments is preponderantly
an eastern institution, in so far as the number of plants
that have adopted it is concerned. A little less than 5% of
the establishments that reported operation on the schedule
are located in the central states, another 3% are scattered
through southern states, while 109, are in New England
states. The remaining 829, are in the Middle Atlantic
States, with 70%, in New York State alone. This concentra.
tion in the northeastern states, and particularly in New
York, is undoubtedly due in part to the fact that this section
is predominantly the manufacturing section of the country;
and in part to the prevalence in this section of the garment
and printing industries.
        <pb n="35" />
        CHAPTER 111
THE TECHNIQUE OF THE FIVE.DAY WEEK
SCHEDULE

S° radical a departure from prevailing practice as the
entire discontinuance of plant operation on one day of
the week other than Sunday is not likely to be
adopted unless the management of the individual plant is
satisfied that, in its particular case, there are good reasons
for doing so, and that the best interests of the company will
not thereby suffer. The reasons given by plant officials who
have made this change are not necessarily the only considerations
 that dictated the advisability of the change, but
these reasons, discussed below, indicate the more obvious
motives influencing the adoption of the five-day week
schedule.

Reasons ror ApSprion oF THE Five-Day Week
The reason most frequently avowed by reporting companies
 for substituting a five-day for a five-and-one-half or
six-day schedule is to give employees more leisure time.
While it may be granted that the average employer of today
is genuinely interested in promoting the welfare of his workers,
 it is difficult to believe that so important a departure
from established practice is due primarily to the desire to
provide a free week-day for the enjoyment of the working
force. It seems rather more reasonable to assume that something
 additional should be read into this reason for shortening
the work schedule. It may be believed by these employers
that the extra day of leisure and recuperation would make
for higher efficiency during the five days of operation and
therefore be a justifiable administrative expedient. Or, the
more far-sighted employer, of broad social feeling, may
conclude that the increasing pace and intensity of modern
manufacturing procedure, with its resultant nervous strain
upon the worker, would make too prolonged an application
75
        <pb n="36" />
        26

THE FIVE-DAY WEEK

to work a menace to health and continued vigor; and that
in the interest of a present and future physically sound working
 force of high efficiency, an antidote must be found for
this strain.
Another reason frequently cited for the change to a fiveday
 week is the elimination of an uneconomical Saturday
half-day. There are always certain fixed costs inherent in
placing a plant in operation, a fact that is particularly true
when the plant operates its own power house. When these
costs and the usual costs of overhead are spread over a halfday’s
 production, especially when it is a quite general experience
 of employers that the half Saturday production is
usually below a half of the output of a normal week day,
unit production costs naturally rise.
Moreover, efficiency on Saturday forenoons is likely to be
below normal for a number of reasons. In the first place
there is the problem of poorer attendance, particularly in
plants that employ considerable numbers of women. The
loss in wage for only a half day’s lay-off from work is,
in many instances, insufficient to overcome the inertia
against going to work, especially when the daily trip to the
plant involves inconvenience and expense or consumes considerable
 time. Married women also find it advantageous
to take the Saturday forenoons for house cleaning and for
catching up with their domestic duties. In addition, during
the open months of the year, a Saturday forenoon lay-off
permits the enjoyment of a longer week-end outing; and
in these days, when the low-priced automobile has brought
camping and sight-seeing trips within the reach of almost
every one, this is no small factor. While these difficulties
have long been recognized and many employers have endeavored
 to cope with them by various means, the results
have generally not been successful.
Operating a plant with a depleted working force is unsatisfactory
 on any day, but this difficulty is further complicated
when it occurs in differing degree on different Saturdays and
without previous notice to the plant manager. Absentees
from work reduce the productive output not only on their
own account, but also often handicap the work of others
with which their own work is interrelated. If a considerable
        <pb n="37" />
        TECHNIQUE OF THE FIVE-DAY WEEK 27

number from one department are absent simultaneously,
the department may be unable to function at all.
Furthermore, working morale is usually and naturally at
lower ebb on Saturdays than on other days. A week of
work is behind and only a few hours remain before the
week-end freedom begins. Work is therefore apt to be performed
 in a more perfunctory and preoccupied manner, as
the worker is preoccupied with plans for the week-end. The
tendency for groups of employees to indulge in conversation
is greater than usual; general plant discipline is relaxed;
production suffers and, simultaneously, unit costs increase.
It is no wonder, therefore, that any new plan which
gives promise of accomplishing a greater weekly operating
efficiency should receive serious consideration. Some employers
 who use the five-day work week schedule were, even
prior to its introduction, convinced that the change could
be made without serious loss of production; and information
furnished to the Conference Board indicates that their
expectations were generally realized. Others anticipated
some loss of output and experienced it, but are nevertheless
satisfied with the new arrangement. They believe that the
manifold advantage in not attempting to operate the plant
a half day on Saturday compensates for whatever decrease
in productive output results. They see also the added
advantage of more satisfactory performance of maintenance
and repair work in and around the plant during the full sixth
day of the week, without interference with or by the regular
production work. This consideration naturally carries more
weight in some industries than in others. In some, outside
of an occasional breakdown and maintenance work of a
routine character, little difficulty is encountered in keeping
the equipment in good running order; in others, definite
time must be set aside each week for a thorough cleaning and
overhauling of the machinery.
An entire free week-day, with the plant shut down,
offers an ideal opportunity for this thorough overhauling.
Delays incident to giving preference to production work are
eliminated, and the maintenance crew can proceed with the
efficient performance of its work as the sole consideration.
Aside from all these reasons, a potent factor in the adop-
        <pb n="38" />
        78

THE FIVE-DAY WEEK

tion of the five-day week in certain industries is its connection
 with Jewish religious practice. The orthodox Jew is
forbidden to perform work on the Hebrew Sabbath, which
extends from sundown on Friday to sundown on Saturday.
Although economic necessity of conforming to existing conditions
 of life and labor and the tendency toward a more
liberal interpretation of orthodox principles have resulted
in wide-spread disregard of the religious precept, the more
orthodox members of the race, particularly the religious
leaders, have seen in the advent of the five-day week an
opportunity to re-establish the strict observance of the faith,
and consequently have lent strong support to the movement
for the shorter work week.
It has already been remarked that the earliest instance of
five-day week operation discovered in this survey owed its
origin to a desire to observe the Hebrew Sabbath. It has
also been noted that a considerable majority of the instances
of five-day week operation were found in the vicinity of New
York City, which contains probably the largest urban concentration
 of Jewish population in the world. Furthermore,
most of the companies in New York that observe the fiveday
 week are in the garment industries, in which Jews predominate
 both in the managements and among the employees.
 It is evident, therefore, that its relation to the
prescribed observance of a cardinal requirement of the
Hebrew religion has been an important factor in the growth
of five-day week operation and is likely to continue to stimulate
 its spread in the future.

Tue LencTtH oF THE Working Day
The assumption is made by many persons that a fiveday-week
 schedule of work necessarily means a 40-hour
work week. This linking of the two is probably due, in the
main, to the fact that they have been combined in the demands
 of organized labor, and also because the Ford Motor
Company operates on this weekly work schedule. But there
1s no more inherent reason why the five-day week should be
limited to forty hours than that the five-and-one-half or
six-day week should necessarily consist of forty-four or fortyeight
 hours. As a matter of fact, outside of a few industries
        <pb n="39" />
        TECHNIQUE OF THE FIVE-DAY WEEK 29

in which the workers are closely organized in labor unions,
a longer than 40-hour work schedule is frequently found in
connection with the five-day week. It appears to be quite
as common a practice, if not to retain the same number of
hours in the week as formerly, to reduce them only slightly
and to distribute the total work hours over five days in the
manner which would work out most satisfactorily in each
individual case.
Table 6 presents an analysis of the changes in work hours
per week in 219 of the 270 establishments that have introduced
 the five-day week. Thirty-six companies reported
that the five-day week had been in effect in their establishments
 since they had been in business, and these, with
fifteen others that did not report their hours of work, have
been omitted from the tabulation.

TapLe 6: ComparisoN oF WEEkLY Hours or WORK IN
219 ESTABLISHMENTS BEFORE AND AFTER
InTRODUCTION OF Five-Day WEEK
'Source: National Industrial Conference Board)

Six-Day Basis

Five-Day Basis
Plants Oper~+ing Specified Hours per Week
cr &amp;lt;sdlazer 34] sslsssdlsondl s0

Hours |
ner Week

Plants

35 I37341
cel

En

ial,

55
3414
4
354
3
214
50
19%
193%
19
48
4714
17
1634
16
1534
4
414
4
4314
18

7

3
1

ve

+!
si 1 « .
a. he 2 Sela
Total..| 219 111 l10al11 5 1313 [27019] 1 Js Ts 112 %
        <pb n="40" />
        30

THE FIVE-DAY WEEK

The tendency to reduce the total number of work hours per
week upon the introduction of the five-day week is apparent
from this table. It shows that prior to five-day operation a
44-hour week was effective in the largest number of plants
covered, followed in order by the 48-hour and the 50-hour
week. Under the five-day schedule, the 40-hour week became
 the most generally adopted plan, followed by the 44-hour
 and 48-hour schedules. Organized labor was undoubtedly
 instrumental in effecting the changes to the low classifications,
 since changes of this character occurred mainly in
the highly unionized industries.
According to the information obtained and here recorded,
five companies were working a 50-hour week on a five-day
basis. Sixty-eight companies, or about 319%, were operating
more than forty-four hours, but not over forty-eight hours,
per week. If the small union establishments were omitted,
the majority of companies with five-day working schedules
would be found in this latter group, and it is between these
limits that are likely to be found most of the plants which
change to the five-day week.
That the change to the five-day week does not necessarily
involve a reduction in the total number of hours of work
per week unless the weekly schedule on a five-and-one-half
or six-day basis is above fifty hours, and unless legislative
restrictions on hours exist, is evident from the fact that
twenty-seven, or 129, of the companies covered in Table 6
effected the change without a reduction in total hours, and
three companies even increased their working hours slightly.
While in some cases rather sharp reductions in total working
hours per week were made, in many instances the reduction
was small and is to be accounted for largely by adjustments
to secure working days of uniform length under the five-day
schedule.
This process of adjustment has been worked out in different
 ways by different companies. The problem, of course,
is to spread the former Saturday hours, or as many of them
as are to be continued, over the five other days in such a way
as to cause the least inconvenience and to be most generally
satisfactory. As a rule, this additional time has been added
at the beginning of the work day and at the expense of a
        <pb n="41" />
        TECHNIQUE OF THE FIVE-DAY WEEK 31

shortened lunch period, but has rarely been added at the
close of the day. When it is not convenient to have five days
of equal length, there is a tendency to make the Friday work
schedule a little shorter than that of the other days. Some
companies, however, prefer to have five equal days, even
when they result in such unusual lengths as nine hours and
twelve minutes or nine hours and thirty-six minutes. Table?
reproduces the daily work schedules of 194 plants operating
on a five-day basis, and indicates the variety of daily work
schedules in effect.

TasLE 7: AnaLysis oF WEEKLY WORKING SCHEDULES OF
194 EstapLisuMENTS OPERATING ON Five-Day WEEK
(Source: National Industrial Conference Board)
TE ET EE rm ——iaisi—
Length of Working Day in Hours and Minutes
Monday ' Tuesday ' Wednesday I Thursday | Friday
7.00
7.30
8.00
R.00
R30
2.30
245
2.00
3.00
“45
2 40
48
©.45
9.00
9.30
9.00
9.12
9.15
9.00
9.20
9.30
9.36
10.00
9.40
8.00
9.45
9.50
Nv)

§¢
4¢
*“

Limitations Imposed by State Statutes
A desired distribution of working hours over five days of
the week may encounter limitations imposed by state
        <pb n="42" />
        32

THE FIVE-DAY WEEK

statute. In New York State, for example, the present law
governing the employment of women in manufacturing industries,
 which became effective January 1, 1928, prescribes
as a maximum an eight-hour day and a 48-hour week, except
that when a half-day only is worked on Saturday a maximum
of nine hours is allowed on five days, and four and one-half
hours on Saturday, making a total of forty-nine and one-half
hours for the week. An additional allowance of seventy-eight
hours overtime per year is made. It is apparent, therefore,
that industries employing considerable numbers of women
would be unable, in New York State, to arrange daily working
 schedules in excess of nine hours without recourse to the
overtime allowance, and it may be necessary to conserve this
overtime for emergency needs. Table 7 shows that on this
basis the five-day schedules of forty-four of the 194 companies
listed would be illegal in New York State for companies
employing women.
That this difficulty is not imaginary but very real is shown
by the fact that nine instances of abandonment of the five
day week in New York State were noted during this investigation
 as having been caused by the law described. These
companies found the forty-five hours per week allowed by
the law for five days’ labor inadequate for their production
needs, and reluctantly reverted to the five-and-one-half day
schedule. In all except one of these cases, the total weekly
schedule of hours was below the maximum of forty-nine and
one-half hours permitted by the law, but it could not be compressed
 into five days without exceeding the maximum daily
allowance.
Some companies have combined a reduction in the number
of hours per week, as necessitated by law, with a distribution
of the overtime allowance over the year, and have worked out
a schedule which, if not entirely satisfactory, suffices to petmit
 the continuance of the five-day week.” One such company,
 upon learning the effect that the present law restricting
the working hours of women would have upon its five-day
schedule, took the matter up with the state legislature. A
letter from the president of the company to a member of the
legislature contains this history of the company’s experience
with the five-day week:
        <pb n="43" />
        TECHNIQUE OF THE FIVE-DAY WEEK 33

“During the summer of 1920, in order to give our employees an
opportunity of enjoying non-employment on Saturday as well as
Sunday during the hot summer weather, we changed our working
schedule to five days a week instead of five-and-one-half as formerly,
ncreasing the schedule of the five days to 9 hours and 35 minutes, or
47 hours and 55 minutes a week. This schedule met with so much
favor with our employees that when in the Fall we proposed to resume
‘he regular working schedule, we received a practically unanimous
petition from the employees to continue the same schedule during
the winter months also.
“Under the provisions of the present law we understand that we
are only permitted to work nine hours on account of the employment
of women, who represent the majority of our employees at the present
time, and we have been appealed to by all of our employees to do our
utmost to have the present schedule, which has now been in existence
for approximately eight years and is very much favored by every one
of our employees without exception, continued. . . . From a
material point of view it is quite indifferent to us whether we work the
48 hours a week in five-and-one-half days instead of in five days, and
we are merely urging the privilege of continuing the schedule as we
are now doing for the benefit of our employees.”

Corroboration of the employees’ attitude is contained in a
etter from the President of the Employees’ Aid Society of
-his company to the Speaker of the State Assembly: '

“At a meeting of the Employees’ Aid Society of this company, a
resolution was voted on and adopted to petition the Assemblyman
and Senator of this District to ask for an amendment to a Bill passed
by the House in the last session, known as the Mastick Bill. This Bill
is unfair and restrictive to our female workers, as it limits the hours
of labor not to exceed 9 hours per day. This will be a hardship to a
great many industries who are now working 48 hours in 5 days. We
are working that plan here since 1920 and the workers at the meeting
mentioned were up in arms against any proposed change that will take
away their Saturday holiday.
“We are working 9 hours, 35 minutes per day, which makes 47
hours, 55 minutes per week in 5 days. This ideal way of working
gives us all day Saturday and Sunday for rest and recreation. We
have a great many married women and widows with children working
here who have assured me that if we have to work on Saturday they
will have to give up their positions with us as they now use Saturday
and Sunday to clean up their homes and prepare for another week.
“We would also draw your attention to the fact that this Bill calls
for a 4914-hour week, as 9 hours per day and 424 hours on Saturday
make a longer week than we are now enjoying. I would ask you to use
vour influence with our Assemblyman and Senator to see that this
        <pb n="44" />
        THE FIVE-DAY WEEK

Bill is amended before the Legislature adjourns as this vitally affects
about 800 workers of ———— and one of —— largest industries. We
are more than pleased with our present way of working and ask you
to help us in our effort to continue our present working schedule,
Respectfully yours,
————— Company
Employees’ Aid Society
President.”

This company, upon failing to obtain relief from the legislature,
 worked out a schedule for continuing the five-day
week by shortening their weekly total hours and using overtime
 allowance. Other companies could not find in this
method a solution of their difficulty and returned to a fiveand-one-half-day
 schedule. Without exception, these companies
 voiced their approval of the five-day week operation
and its popularity among their employees, but found it impossible
 to reconcile their production requirements with the
restrictions of the law,
This situation suggests that over-rigidity in restrictive legislation
 can work to the disadvantage of the very group it is
intended to benefit. It probably did not occur to the framers
of the statute in question that, in thus limiting the maximum
hours that women could work, they were legislating some
women out of a free Saturday and preventing others from
obtaining it. There is grave doubt whether any of the physical,
 social or economic advantages urged in favor of the socalled
 48-hour law for women would not have been served
better had this law provided the reasonable latitude that
would permit the distribution of the forty-eight hours over
five days, if desired. Legislation assumes the prerogative of
exact science when, in effect, it asserts that nine hours rather
than nine hours and thirty-five minutes constitute the maximum
 number of hours per day that a woman can work with
out detriment to health.
The number of hours to be worked per week in case of
change to a five-day schedule is a matter of great importance.
If the change to a five-day basis can be effected without disturbing
 the total hours of work per week, two problems that
are really troublesome are avoided altogether—that of the
number of hours which would otherwise have to be dropped
        <pb n="45" />
        TECHNIQUE OF THE FIVE-DAY WEEK 35

from the former weekly total, and that of the adjustment in
wage rates necessary to compensate for this lost working
time. Inability to arrive at a satisfactory answer to these
questions is likely to be the chief stumbling-block in the way
of those who are seriously and sympathetically considering
the adoption of a five-day week schedule.

ADJUSTMENT OF WAGE RATES
Consideration of the five-day week inevitably brings up the
question of its effect upon wage scales and upon the earnings
of the workers affected. When no change in total hours per
week is involved in the changed work schedule, the wage
question does not enter, but if so much as a half-hour is
dropped from the weekly total, the problem of adjustment
becomes an important issue. The decision in this matter
may rest with the employer, it may be arrived at by joint
agreement between management and employees or, in the
case of unionized industries, it may be practically dictated
by the labor union.
In a number of the union trades in which the five-day
week schedule is prevalent, wage scales had already been
established upon a weekly basis before the shortened weekly
work schedule was adopted. The change to the five-day
basis, which usually involved a reduction of several work
hours in the weekly schedule, was negotiated with the understanding
 that weekly wage scales would remain unchanged.
This, in effect, amounted to an increase in the wage scale to
permit the earning of the same amount in a shorter work
week as was formerly earned in a longer one.
When the decision governing wage scales is not affected by
outside influence, diverse policies prevail. The wage payment
 system already in force is an important factor in the
situation. Where employees are paid on the hourly rate
basis, no effort for increased production on their part can
make up for their wage loss through reduction in the number
of hours per week, since it is the hourly rate multiplied by the
hours worked that determines their weekly earnings. Where,
on the other hand, piece work or a premium or bonus system
of wage payment is in effect, the employee has some measure
of control over his earnings and, conceivably, can increase
        <pb n="46" />
        316

THE FIVE-DAY WEEK

them by additional effort and application. Consequently,
the need for wage adjustments would seem greater in the case
of employees on hourly or weekly wage rates than in cases
where incentive wage systems are in force.
One hundred and fifty-one of the 270 establishments
studied gave information regarding the wayin which thewage
problem had been handled at the time of the shift to the fiveday
 week. Sixty-two, or 41%, reported that since no material
 change in total hours per week had been made, no adjustment
 in wages had been necessary. Of the remaining eightynine,
 ot 59%, that had reduced the working hours per week, it
was found that fifty-three companies had adjusted wage rates
to permit the earning of as high wages under the shortened
schedule as had formerly been earned under a longer one, and
twenty-eighthad made no wage adjustment to compensate for
the shorter working schedule. Three of the remaining eight
plants had made a wage adjustment that partially compensated
 for the Jost time, and five plants had increased hourly
rates but had made no change in piece rates. It appears,
therefore, that in round numbers employees in 75%, of the
companies which furnished information on this subject did
not suffer loss of wage income from the change to the fiveday
 schedule.

Quertime Arrangements
The companies found to be operating on a five-day weekly
schedule did not, as a rule, find overtime work necessary.
Some employers, whose establishments were unionized,
stated that overtime was forbidden by union regulations,
and that they could not, therefore, operate their plants overtime
 even if they wished to do so. One employer explained
that for some time there had been overproduction in his industry,
 in which a year’s requirements could easily be manufactured
 in 250 days, and that the five-day week had been
quite generally adopted as a means of spreading the year’s
production over fifty weeks. In consequence, even at times
of peak demand, overtime work was considered undesirable
as well as unnecessary.
On the other hand, seventy-nine establishments, or a little
less than one-third of the total number of plants covered, had
        <pb n="47" />
        TECHNIQUE OF THE FIVE-DAY WEEK 37

seen at one time or another a need for overtime work on
Saturday. This, in turn, raised the issue whether such time
should be paid for at straight rates or at rates in excess of the
normal rates. In fifty-one, or nearly two-thirds of these
establishments, Saturday work was placed in the same category
 as other overtime work and was compensated at higher
than normal rates. In twenty-four, or about 309%, of the
plants, Saturday work was not considered strictly as overtime
work and, consequently, the regular wage rates remained in
force. Two of the remaining four plants paid overtime rates
to those on an hourly rate basis, but did not increase piece
rates. The other two plants paid regular rates for Saturday
work until the total number of hours that had constituted the
work week prior to the change to the five-day schedule was
reached, and paid overtime rates for work beyond this point.
Thus, in the case of a plant that had in changing to the fiveday
 week reduced its weekly hours of work from fortyeight
 to forty-six, the first two hours of Saturday work would
be paid for at regular rates, but overtime rates would be paid
for any work in excess of these two hours.
The proportion by whith overtime rates paid for Saturday
work exceed the regulaf rates is not essential to this study,
since the important point is whether or not Saturday work
was considered in the same category with other overtime
work in plants operating on a five-day schedule. As a matter
of fact, however, time and one-half was paid in a majority
of the fifty-one plants that reported the payment of overtime
 rates for Saturday work, and a number of instances
of payment of double time was noted.

AppLICATION OF THE F1vE-Day ScueEDULE To OFFICE
EMPLOYEES
The adoption of the five-day schedule in an establishment
does not ensure the extension of this schedule to employees
in the plant office. Prevailing practice appears to favor keeping
 the office force at work on Saturday forenoons. Reasons
that may make advantageous the restriction of factory employment
 to five days a week do not necessarily hold with
qual force when applied to the office staff. Furthermore, it
may for business reasons be quite necessary to operate the
        <pb n="48" />
        38

THE FIVE-DAY WEEK

office during the time when the offices of a majority of other
companies are operating. In many instances; shipping departments
 are kept running on Saturdays in order not to
delay deliveries, and for similar reasons receiving departments
 may be operated, or all offices of a company be kept
open for business on Saturdays. Table 8 gives a classification
of the policies of 121 companies with regard to this matter.

TasLe 8: DistriBuTioN oF 121 COMPANIES WITH REGARD
To Poricy or Granting Five-Day Week To Orrice
ForcE As WELL AS To Factory EMPLOYEES
(Source: National Industrial Conference Board)

Policy

! Working ' Not Working
under Union under Union Total
Agreement ~~ Agresment

Five-day week does not apply to office force. . ..
Five-day week applies to office force:
On same basis as factory employees. ......
Half of staff on alternate Saturdays. ......
Women every Saturday; men alternate
Saturdays. ...oevieiiiiiiini anions
Few employees always present on Saturday.
Entire staff during summer months........
Half of staff on alternate Saturdays during
summer. . .

25

45

711

29

37
1

3
Total... .. 35 | 85 | 121t
1 The labor policy of one company not classifiable,

In more than half of these companies it is seen that the
five-day week does not apply to the office force under any
circumstances. Thirty per cent of the companies make no
distinction between office and factory, and the five-day
schedule applies to employees in both throughout the year.
The remaining 119, of establishments, while not considering
that the five-day week necessarily applies to office employees,
make certain concessions in the form of free Saturdays during
the year. Among these plans are the following:
To release half the office staff on alternate Saturdays.
To release half the office staff on alternate Saturdays during
 the summer months only.
To release women employees in the office every Saturday,
and men employees alternate Saturdays.
To close the office on Saturdays during summer months.
To retain only a skeleton force of key people on Saturdays.
        <pb n="49" />
        TECHNIQUE OF THE FIVE-DAY WEEK 39

These variations appear to indicate a desire to extend the
privilege of two free days at the end of the week to as large
a proportion of the total working force as possible, but also a
recognition that, since the prevailing practice throughout the
business world is to include Saturday forenoon as a business
day, it is important to have the company offices open at that
“ime and in a position to meet any demands made upon them.
Failure of the union-enforced five-day week to make similar
 provision for the office workers is indicated by the fact
that, in 719, of the union establishments that furnished information,
 the office staff worked on Saturday the year
around, as compared with 529, of the companies not working
under a union agreement. The five-day schedule was rarely
made applicable to sales or executive offices located away
from the plant, although in a few cases free Saturdays were
granted during the summer months.
It appears from the data discussed in this chapter that
there is as yet little that can be called established practice in
the methods or technique of five-day week operation. Some
companies are subject to union agreements and can not exercise
 their unrestrained discretion. In the case of other companies,
 legislative restrictions sometimes impose conditions
that must be taken into account. Beyond this point, or in
the absence of such limitations, the policy of each company is
guided by conditions in the industry and in the individual
establishment. That the solutions of the problems involved
in the change to five-day weekly operation fall into a few
generally similar categories indicates both the substantial
similarity of the questions involved, regardless of location or
industry, and the ability to arrive at equitable solutions if
there is the desire to put the shorter weekly work schedule in
affect.
        <pb n="50" />
        CHAPTER IV
EXPERIENCE WITH FIVE-DAY WEEK
OPERATION

ENERAL satisfaction with the five-day week on the
part of managements operating on this work schedule
might be assumed from the fact that after trials of
from one to twenty years it is still in effect. But this argument
 alone is hardly convincing. While the introduction
of such a program is likely to be effected without appreciable
opposition on the part of the working force, areturn to a fiveand-one-half
 or a six-day schedule, after employees have
become accustomed to two free days a week, may well be
expected to meet with resistance of the workers. And in the
case of companies that have adopted the shorter schedule to
avoid conflict with strongly entrenched labor unions, a return
to the longer work schedule is practically out of the question.
Consequently, any conclusion as to whether or not employers
who have had experience with the operation and effects of the
five-day week are generally satisfied with it as a permanent
working schedule must rest upon more positive grounds than
its mere continuation.

FrFECT UPON PRODUCTION

Probably first in the mind of the practical operating executive
 is the question of the effect upon production of the
change to a five-day week. This is a difficult question to
answer definitely. Exceptin a few isolated instances, it probably
 may be properly assumed that whatever changes have
occurred in the volume of output since the change in working
schedule took effect have been influenced by a number of
causes and are not necessarily attributable solely to the
change to the five-day week schedule.
Less than half of the companies operating on a five-day
basis were willing to make any statement as to the effect
upon production. Most of the remaining companies claimed
        <pb n="51" />
        EXPERIENCE WITH FIVE-DAY WEEK 4]

not to know what the effect had been. This lack of information
 was apparently due not to a failure to keep records, but
rather to recognition that other changes in conditions had
taken place which largely invalidated comparisons. In some
cases, the character of the product had been changed materially
 on account of shifting styles or demand; in others, substantial
 changes in manufacturing processes had been or were
being made, sometimes as a result of the adoption of the fiveday
 week and sometimes independent of it. These changes
made output comparisons inaccurate, if not entirely futile.
In still other cases where results might have been comparable,
no attempt had been made to ascertain how production under
the five-day week schedule compared with the former output
under a longer work week.

TaBLE 9: WEeekLYy OutpuT UNDER FIvE-Day ScHEDULE
CompareD wiTH QuTruT UNDER FORMER F1vE-AND-ONE-Hair
 anp Six-Day ScuepuLgs, 127 CoMPANIES
(Source: National Industrial Conference Board)
Changes in Output
Total
Num- | Per
ber | Cent
100
100
100
222 127 1100

Reduction. . . .....
No em |
[ncrease..........
Total... ...

Table 9 presents a classified analysis of the effect of fiveday
 week operation upon production as reported by 127
companies. Of ninety-four companies that had reduced the
total hours of work per week in changing to the five-day
schedule, approximately one-quarter claimed that production
had declined in about the same proportion. Six companies
reported a substantial loss in output, while forty-six companies
 saw no appreciable change. On the other hand,
eighteen companies reported that production had increased.
Since the hours of work per week of this group had been
reduced in changing to the five-day schedule, it appears that
        <pb n="52" />
        12

THE FIVE-DAY WEEK

nearly 70% of these companies have suffered no loss in total
output per week and are, therefore, obtaining greater production
 per hour than under the longer working schedule.
Unless wage scales were substantially increased, this seems
to indicate that management has not lost through the
change, and is actually operating with a lower unit cost of
output.
Of thirty-two companies in which weekly hours were maintained,
 more than one-half found production the same under
the five-day as under the longer schedule, and fourteen noted
an increase in output. Only one company reported a loss in
output, and this would seem to have been caused by reasons
other than the change in working schedule. The single company
 that reported an increase in hours had discovered no
increase in output.
Considering these companies together, without regard to
changes in total hours per week resulting from the adoption
of the five-day week, it appears that an almost even half
found weekly production unchanged, and another quarter
noted an increase. How much of the maintenance or increase
 in output, especially in those plants in which the hours
of work per week had been reduced, was due to better management
 methods, including better processing, and how much
to more active cooperation and application on the part of the
working force, it is difficult to say. Undoubtedly both have
been factors in accomplishing the desired result and have
demonstrated that maintenance of production can be accomplished
 on a considerable scale.
The data presented reveal other significant facts. More
than half of the plants in.which production declined in proportion
 to the reduction in weekly hours are now operating
on a union-enforced 40-hour week. Only one company works
as long a schedule as forty-seven and one-half hours per week.
Companies that adopted the five-day week as a result of
union agreements, which also provided that weekly wages
remain the same in spite of reduction in weekly hours of
work, are thus the chief sufferers from loss of production.
This result seems natural, since under these conditions there
is no incentive for producing at any more rapid rate than
before the change in working schedule. On the other hand,
        <pb n="53" />
        EXPERIENCE WITH FIVE-DAY WEEK 43

less than 109 of the plants that reported maintained or increased
 production are in the 40-hour per week group. As a
rule, plants in which production was maintained or increased
were the larger ones, and reduced output was reported by
the smaller establishments.
Character of product or nature of process, although less
important than management, have no doubt something to do
with the effect upon production of a reduced work schedule.
A clothing establishment employing 250 workers shortened
its work week from forty-eight to forty hours in changing to
+he five-day week, and reported a decrease in output approxi
mately equivalent to the eight hours productive time lost.
A larger company manufacturing paper products made a
similar reduction in hours of work but found a decided increase
 in the weekly volume of output. A third company
reduced its weekly working schedule by eleven hours and still
found weekly production increased, while in a fourth company
 the shortening of the work schedule by one hour per
week resulted in a lower output per week.
One company, with a product which permits an accurate
standard of comparison, gave the following results for the
veriod since the adoption of the five-day week, with the
statement that this change must not be considered necessarily
attributable to the shorter working schedule. It is apparent,
however, that the reduction in hours per week from fifty-five
to forty-eight did not seriously affect efficiency of operation.
The figures given are as follows:

1920... ..
\g21.....
922...
23...
"4,
25.
"26...
F227. iawn snipes
928 (First half year).

VALUE oF Propuer SuippED PER DoLrar oF Wace Cost
$7.11
. a0
&amp;lt; 40
ny
"26
77
“3

Contradictory experiences are a warning that too much
stress may easily be placed upon the supposed effect upon
production of a change in the working schedule. Apparently,
the adoption of the five-day week has been responsible alike
        <pb n="54" />
        14

THE FIVE-DAY WEEK

for the increase, the decrease and the maintenance of production.
 Actually, the five-day week has probably had no
effect in some cases, while in other instances, by acting as a
stimulus to both management and employees to ensure its
continuance, it has indirectly been the cause of effecting
economies and improvements that might just as well have
been discovered and made effective earlier. In such cases the
five-day week schedule has become the beneficiary of efforts
that might as well have been inspired by another cause.
OreraTING EcoNoMmiEs
It is somewhat difficult to distinguish between effect upon
production and effect upon operating economies resulting
from the adoption of the five-day week, since the two are
closely linked. However, there are certain obvious possibilities
 for economy that are not directly connected with any
change in production.
The saving from the shorter weekly working schedule most
frequently mentioned was reported by plants operating their
own steam power plants. While no quantitative savings in
fuel were given, the statement was repeatedly made that
banking the fires on Friday night without the need of bringing
 them up on Saturday morning had effected an appreciable
saving in coal consumption each week. This was particularly
marked in the winter months, when heat as well as power was
furnished. Almost equal emphasis was given to the advantage
 of devoting full Saturdays to maintenance and repair
work. The value of this uninterrupted period for a general
tuning-up of equipment is being felt with increasing force, if
one may judge from the reports received. While it had been
the general practice in many plants to make periodic, usually
weekly, inspections and repair of apparatus and plant on
Sundays or Saturday afternoons, this work had often necessarily
 to be performed under difficulties that rendered it next
to impossible to make any but the most obviously necessary
repairs. But when this maintenance work could be performed
 without pressure, it was found that adjustments
could be made and incipient troubles detected and corrected
before they reached an advanced stage, with the result that
stoppage of production due to mechanical failure during the
        <pb n="55" />
        EXPERIENCE WITH FIVE-DAY WEEK 45

week became a rarity. The reports from some companies
mentioned this practical elimination of machine failures as
an important reason for their ability to maintain or increase
production in spite of a shorter working schedule per week.
Probably this freedom from machine breakdowns is most
appreciated in the continuous process industries. The statement
 of a paper manufacturer shows the value of sufficient
time for repair work:

“For the greatest efficiency a paper machine must be run from
Monday to the week-end without stopping. Any shut-downs cause
partial idleness in each department and to avoid these shut-downs
all equipment must be maintained in perfect condition. Under the
six-day week all clean-up and repairs were supposed to be done on
Sunday when everyone wanted to get through in a hurry, resulting in
many cases in temporary makeshifts which again would break and
cause further shut-downs during the week.”

Attention was also called to the economic loss due to the
time required in starting and closing down a plant, which in
some industries is a considerable item. For example, in the
printing and lithographing industry, which has adopted the
five-day week extensively, the process of oiling and cleaning
the presses at the beginning of the day and the wash-up at
the end of each day’s run frequently take as long as an hour.
[t is obvious, therefore, that the fewer are the days into
which production work can be compressed, the smaller will
be the proportion of non-productive time. Similarly in other
industries, though usually in less degree, the time lost each
working day because of special preparations necessary for
starting the production process indicate the saving that could
be effected by reducing the days of operation from six to five
cach week, if productive requirements permit.

PuNcTUALITY AND ATTENDANCE

The effect of the five-day week in stimulating regularity in
attendance and promptness in reporting for work was commented
 upon by a number of employers as by no means the
least of the advantages resulting from the shorter work
schedule. Poor attendance on Saturday mornings had become
 habitual in many of these establishments, and was
        <pb n="56" />
        16

THE FIVE-DAY WEEK

particularly marked during the summer months. But with
the shorter work week, especially where hours of work had
been reduced without adjusting wage scales, there was a
natural desire to capitalize to the full all available working
hours. That decided improvements in attendance had taken
place was mainly attributed to the five-day work schedule,
as is apparent from a few quotations from letters:

“The change to a five-day week was made because of the desire to
provide more leisure for our working force, and it might also be interesting
 to you to know that our production increased since the installation
 of the five-day week without additional force; also that our rate
of illness has decreased about 309, and our rate of lateness has
Jecreased about 809.”

“Under the old schedule it was noticed that our list of absentees
was larger, especially on Saturdays, which we attributed to the shorter
ger, esp y
day.”
“There is a noticeable reduction in lateness and absence.”
“We have many married women who need more time for shopping
and housework. Under the old system our attendance was bad on
Saturday and we never received a half-day’s work. Now our attendance
 is perfect and our labor turnover is less than one per cent per
month.”
Lasor TurNoOVER

The effect upon labor turnover has for years been the test
applied to various devices for stimulating efficiency. It has
been used as a kind of infallible and conclusive indicator of
their adequacy and success. This barometer of industrial
health and good-will has become sanctioned by long usage,
yet it is difficult to accept this criterion, either as necessarily
conclusive or as possible of exact measurement. Without
entering upon an extended discussion, it may be suggested
that complete elimination of labor turnover in a plant might
be more of a calamity than a boon, and that reduction of
excessive turnover in this period of rapidly changing conditions
 within industry is probably due to the inter-play of so
many factors that it would be difficult to isolate the fair
proportion of reduction caused by any single agency.
Where, however, conditions in an industry or in a single
establishment have been such as to make the work so unde-
        <pb n="57" />
        EXPERIENCE WITH FIVE-DAY WEEK

sirable as to cause excessive change in the labor fii
conceivable that the introduction of the five-day wet
well make such work more attractive by holding «
reward of an extra free day each week. The introductio..
the five-day week, coupled with a general improvement in
working conditions, has resulted advantageously in the case
of a paper-board plant:

ZR
7 &amp;gt;
IN 2
HELENE
ht =
“hey 5
gE

“The industry was in the first place overproduced, and the working
conditions in the mills were very bad. In the board mills the only
labor which was attracted to this unwholesome work was of a very
low caliber. By remedying these conditions, shortening the hours and
restricting operation to five days a week, we thought that the whole
problem would be simplified and production per capita increased.
This has to a great extent proved correct.”

So long as five-and-one-half or six-day operation is the
rule, an advantage in competing for desirable labor will come
from five-day operation. It has been brought out frequently
 in this study that employees generally react favorably
 to this plan, even when it entails longer hours on the
five working days. Other conditions being approximately
equal, therefore, the plant with the five-day week will appear
as a more desirable one in which to work and consequently
will exert a better hold on the working force, as it will also
more readily attract new workers.
Another consideration affecting labor supply applies
particularly to industries that employ large numbers of
women. In many establishments, married women are preferred
 because they are considered steadier and more permanent
 employees. The five-day week attracts such women to
industrial employment because an entirely free week-day
gives them time to perform their domestic duties, while
adding to the family income by working outside the home
the other five days.

OTHER ADVANTAGES
In the general summing up of the benefits believed to
have been derived from five-day operation, employers mentioned
 a number of points that, while not determining influences,
 have at least been noted with considerable satisfac-
        <pb n="58" />
        18

THE FIVE-DAY WEEK

tion. Thus, several companies pointed to the real advantage
of a reserve of possible working hours on Saturdays in case
of emergencies. While averse to such overtime as a regular
arrangement, the possibility of making their working schedule
 more elastic when necessary gives them confidence that
they can meet whatever situations may arise.
“Employees with more time to buy things work harder
for money to buy with, and also seem to strive more toward
education, comforts, etc.,” is the experience reported by a
textile finishing company. This statement tends to bear out
the sociological argument that greater leisure stimulates the
cultivation of the means that make possible its greater enjoyment.
 But while some employers think that employees are
spending more as a result of the free day, others believe that
they are saving more. A textile manufacturing company
that introduced the five-day week in 1921 reports:

“Deposits in savings fund managed jointly by employees and company
 have shown steady increase from year to year, amounting at
present to approximately $275 per depositor with an average of about
609%, of employees participating.”

The effect of a longer period of leisure and relaxation each
week upon working efficiency was pointed out by several
employers, although others could see no change. Typical of
the remarks of those who noted a difference are the two
following quotations:

“Efficient working pitch better maintained by concentration into
fewer days, with proper rest intervals to relieve any strain of longer
daily hours when nature of work makes this desirable. Reduced need
for days off or lengthy vacation periods.”
“Greater relaxation over the week-end gives added pep to week’s
work.”

Undoubtedly, the most novel and distinctive adaptation
of the five-day schedule is reported by a manufacturer of
aircraft instruments and equipment:

“One of the outstanding advantages results from the fact that we
shift the working days in any week where a holiday falls on a Tuesday
or Thursday, transferring the work day from Monday or Friday to
        <pb n="59" />
        EXPERIENCE WITH FIVE-DAY WEEK 49

Saturday. This provides throughout the year from five to ten long
week-ends, 1. e., a period of no work for three or four days. Everyone
Gnds this highly desirable and beneficial.”

To illustrate this plan by an example: Christmas Day in
1928 fell on Tuesday. Instead of keeping the plant open on
Monday, the twenty-fourth, and closing as usual on Saturday,
 the twenty-ninth, the plant was closed on Monday,
giving everyone a work vacation from the preceding Friday
night until Wednesday morning. The time lost on Monday
was made up by operating on Saturday of that week. Or,
in the case of Thanksgiving, the plant was operated on the
preceding Saturday and remained closed on the Friday and
Saturday following Thanksgiving Day.

DisaDVANTAGES AND OBJECTIONS

Although nothing but advantages of five-day week operation
 have so far been presented, objections have also been
pointed out by those who have had experience with it; but
it appears that these objections are fewer and, as a rule, less
fundamental in character’ than the advantages cited.
The attitude of employers operating a five-day schedule
but considering it disadvantageous seems to be strongly
influenced by whether or not the five-day week was introduced
 with their full approval or was forced upon them by
organized labor. It is natural that they should resent a
program they have been compelled to accept, and that they
should magnify its shortcomings, just as on the other side
there may be a tendency to minimize the disadvantages of a
plan which has been voluntarily introduced. Some unionshop
 employers declared themselves satisfied that the fiveday
 schedule is desirable, but others made no attempt to conceal
 their disapproval of a program of fewer hours of work
at unreduced pay, which they view as little short of confiscation,
 and have been outspoken and caustic in their
criticisms. One small-shop proprietor remarked:

“The only advantage is a benefit to the union. Employees do not
produce the work they are capable of for the reason that they want to
set in additional overtime for which we must pay time and one-half.”
        <pb n="60" />
        50

THE FIVE-DAY WEEK

The criticism of another union-shop proprietor was in
much the same vein:

“Less work and the same pay. Our cost of production increased,
thereby causing almost all of the big out-of-town buyers to go to
factories located in small towns with cheaper labor, to buy their
goods.”

When employers had voluntarily decided to change to the
five-day week, whether or not the idea originated with the
employees, some found certain disadvantages in the shorter
schedule, but they tended to view these as drawbacks such
as are likely to be a part of any innovation, rather than as
handicaps imposed upon them against their will. Thus, a
manufacturer of automotive equipment found certain practical
 difficulties, which did not, however, appear to him insurmountable,


“There is the problem of convincing an occasional customer, who
comes in at the eleventh hour with an order to be shipped Saturday,
that Saturday is not in our production calendar.”

Another employer with much the same problem—that
of receiving goods ordered and shipping rush orders on
Saturdays—solved the difficulty by maintaining a small
group of about 10%, of the force for Saturdays, while still
another abandoned the five-day week because “customers
required service on Saturday and competition with five-andone-half
 day shops made our costs unfavorable.”
One employer complained that some of his employees
found jobs for Saturdays, such as tending market stands,
and that this defeated the purpose of the five-day week,
which, by implication, is an extra day of complete rest.
There may well be a difference of opinion as to the validity
of this objection. Itisawell-substantiated view that a change
in work often offers as complete a rest as doing nothing. In
fact, many employers cited as an advantage of the five-day
week that employees could make necessary repairs on their
homes, or work in their gardens, and there is considerably
more exertion in such work than in tending a market stand,
even if it does not bring direct monetary compensation.
From this viewpoint, the thrifty employee who adds to his
        <pb n="61" />
        EXPERIENCE WITH FIVE-DAY WEEK 51

income by working for wages on Saturdays would not appear
to be losing the value of his weekly day of freedom from the
accustomed work, so long as the spare-time work is of a
different character from that of his regular occupation.
A more serious objection mentioned by a few employers
is that the compression of the work week into five days has
made these five days too long, particularly in the hot summer
months. In one plant, a poorer quality of work was observed,
 which was attributed to longer working hours under
artificial light during the winter months. An employer who
approved the five-day week in principle, but had not been
able to adapt it to the work in his plant as a regular schedule,
had such an objection:

“We work a fifty-hour week from 7.30 a. m. to 5 p. vm. We found
‘hat a five-day week would not give us an economical volume pro-Juction
 unless we worked a ten-hour day. A ten-hour day with two
days a week off would no doubt be satisfactory to some of our men,
but there are jobs in our plant at which we feel no man would or should
work ten hours daily. The resulting fatigue would so increase the
accident hazard that we feel the benefits of a five-day week in such
cases are very questionable, not to mention the moral responsibility
involved.”

This question of long hours is fundamental and is probably
the consideration that has deterred many companies from
experimenting with the five-day week. Many have found
it possible to shorten their weekly schedule somewhat in
changing to a five-day basis, some without loss of production,
 others accepting a certain loss in output. Where such
a reduction in total hours does not seem practicable, and
where occupational demands are severe, there arises the
question as to the desirability of five-day week operation.
The increase in accident hazard due to longer hours, which
was mentioned by the employer quoted above, is given but
little weight by most employers operating on the five-day
schedule. Since accident hazard is understood to increase as
fatigue dulls the normal sharpness of perception and reaction,
 the lengthening of working hours per day might be
expected to have some effect. In most cases reported, however,
 no difference had been observed; in companies whose
accident frequency had improved, some credit for this better
        <pb n="62" />
        32

THE FIVE-DAY WEEK

condition was given to the extra day of relaxation, but the
improvement was credited mostly to other causes, such as
intensive safety campaigns and departmental safety contests.
[t is dangerous to generalize too much in appraising the
relative importance of objections to five-day week operation.
Such an infinite variety of conditions obtain in different
establishments that what may constitute a serious drawback
in one case may be a positive advantage in another. Furthermore,
 the personal attitude of responsible officials toward
the plan may consciously or unconsciously color their expressed
 opinions and estimates. What seems apparent is
that drawbacks to five-day operation have undoubtedly been
real, at least in many cases, but that it has generally been
found possible to surmount these difficulties if there exists a
genuine desire to confine operations to five davs a week.

ATTITUDE OF EMPLOYEES AND EMPLOYERS
Judging from information furnished by employers, the
vast majority of employees who have had the opportunity
to experience for themselves a five-day work schedule in
operation appear to be in favor of it. Where the change had
been effected without material addition to daily hours of work
and without material loss of wages, this attitude was to be
expected. Where, however, these factors did not work to
the employee’s benefit, the advantage of free Saturdays still
outweighed whatever inconvenience or loss may therefrom
result. Votes among employees have resulted in endorsement
 of the five-day plan by overwhelming majorities.
A shoe manufacturing company reported:

“Universal satisfaction. Our workers come to our village from
many cities and towns by trolley or automobile. They appreciate the
privilege of omitting one round trip and the double rest day. Office
and shipping employees wish it were practicable for them also to
enjoy the entire Saturday off.”

Another company put the case a little differently, and
expressed the attitude of employees to the five-day week in
this wav:

“They are strongly in favor of it; in fact, prefer to do overtime
work at night rather than interfere with the Saturday holiday. Itis
        <pb n="63" />
        EXPERIENCE WITH FIVE-DAY WEEK 53

our opinion that the person who ‘gets up and at it’ reasonably early
in the morning and sticks to it a little longer in the afternoon, with
one full holiday on Saturday, has an advantage over the one who
sleeps a little later, quits a little earlier and thus gets his off time in
useless driblets.”

Frequent allusion was made by employers to the improvement
 in morale that had resulted from the introduction of
the five-day week. Greater zest of employees in their work
has been observed as well as a more cordial attitude toward
the management. A manufacturer of abrasives reported:

“Enthusiastic approval of over 80% of workers by actual vote.
Powerful stimulus to morale. Next to bonus, best continuous effect
of anything company has ever done.”

A number of employers commented upon the practice of
some employees of seeking other forms of remunerative work
on Saturdays. While a few employers condemned this
practice as destroying the purpose of the extra holiday, or
as indicating that employees might just as well be engaged
at their regular occupations, other employers applauded it
as evidence of thrift and a desire to provide for possible
periods of unemployment.
The reasons most frequently given by employees for their
appreciation of the free Saturday differed as between women
and men. Women found in this day the opportunity to attend
 to many household duties that otherwise could not be
properly performed. Some men saw that they could make
necessary repairs on their houses, while others used the day
for recreation, such as hunting and fishing expeditions and
visits to friends. Automobile trips were popular in the
summer, and the morning start helped to avoid the heavy
Saturday afternoon traffic.
That the habit of the free Saturday, once formed, is not
easy to give up, has been the experience of companies that
had introduced the five-day week as an experiment during
the summer and had then sounded out the opinion of their
employees with regard to its continuance as the permanent
working schedule; and also of companies that for one reason
or another had abandoned the five-day week. One employer,
        <pb n="64" />
        THE FIVE-DAY WEEK
located in New York State, gave the following reason for
abandoning the five-day week:

4

“Because of the passage of the most unpopular law with employees
which has ever been forced upon them. We wish members of your
organization could walk into our mill and talk to any employee at
random, soliciting their viewpoint. The management was better
satisfied with the five-day week. A woman is tired with nine hours
and fifteen minutes work but she would rather work thirty-five
minutes longer and have all day Saturday for herself.”

Experience with the five-day week as here recorded appears
 to have justified the anticipations of employers. This
statement is made advisedly. Where employers have expected
 reduced production, higher costs and lessened efficiency
 because of a union-enforced five-day week, they
apparently have not been disappointed. On the other hand,
where the experiment had been made with the hope that it
would work out satisfactorily, it usually has done so. Some
loss in production and in economy of operation has been
accepted by a number of employers, and some loss in earnings
 has been accepted by many employees without apparently
 destroying their belief that, so far as they are
concerned, the five-day week schedule is desirable.
That the experiment has worked out this way in most of
the cases studied does not necessarily mean that it will work
out similarly in all cases. Each company has its own problems
 to consider. A wider adoption of the five-day week
will destroy some of the advantages urged in its favor, but
will remove greater and more fundamental drawbacks, of
which the greatest is probably the competition with companies
 having a longer weekly working schedule.
        <pb n="65" />
        CHAPTER V
VARIATIONS OF THE FIVE-DAY WEEK

A LTHOUGH only instances of year-around five-day
week operation have so far been treated, reference
has occasionally been made to more temporary arrangements.
 It seems desirable to take cognizance of these
because many permanent five-day week plans have grown
out of temporary experiments with this schedule, and also
because in some industries or localities the temporary fiveday
 week schedule might be practicable when a permanent
basis of such operation would not be.

Tue Five-Day Week in SUMMER

The most common adaptation of the five-day week is to
arrange the summer work schedule on this basis. It has for
years been the practice of many mercantile houses to eliminate
 Saturday work during the summer, frequently as a
reward to the employees for working full Saturdays during
the remainder of the year. There seems to be a growing
tendency in industrial establishments to adopt this practice.
Seventy-eight manufacturing companies, in addition to those
on an entire year five-day week basis, were found to be
operating on a five-day summer schedule.
The motive most frequently expressed for adopting this
shortened summer schedule was to reduce strain of work
upon employees at the time of year when this strain is most
acutely felt. Particularly where quality of workmanship
was suffering because of disagreeable and fatiguing working
conditions due to the heat, a longer rest period each week was
considered as a practical corrective for this condition.
Furthermore, a shortened working schedule was looked upon
as less of a problem in the summer, because of general subnormal
 business activity during that period, so that reduced
production at that time might prove as much a boon as a
disadvantage.
        <pb n="66" />
        56

THE FIVE-DAY WEEK

The length of the period during which the summer schedule
remained in effect varied considerably. July and August
were invariably included, and while in most cases the summer
 schedule was confined to these two months, instances
were noted in which one or more of the months of May,
June and September were included.
Among the seventy-eight companies that operated a fiveday
 week summer schedule, there was an almost even division
 between those that eliminated the Saturday hours
altogether and those that spread them over the remaining
five days. Some companies felt that it was sufficient to
provide for free Saturdays and that the Saturday hours
should be distributed through the week, while other employers
 felt that unless the Saturday hours were dropped
altogether the whole purpose of the shorter summer schedule
 was defeated. In all but two of the establishments under
consideration, wage rates had been adjusted, or piece workers
 had increased their output sufficiently to maintain normal
earnings.
A few instances of informal or occasional five-day operation
during the summer were found, when, for seasonal or other
reasons of light production demand, the plant would not be
operated on Saturday. This method of curtailing production
had, in the opinion of two employers, proved advantageous
as a means of maintaining a fully trained force throughout
the year, by preventing extended lay-offs with the danger of
permanently losing valuable members of the working force.
One company that does not make a practice of closing the
plant on Saturday has an understanding with its employees
that if their weekly production quota is accomplished by
Friday night, they need not report on Saturday. Very few
of the employees, the company reported, have found it necessary
 to work on Saturdays.
Some companies have utilized the long summer week-ends
in lieu of vacations for the working force, and feel that this
extra time for leisure is just as beneficial when scattered
through the summer as when concentrated in one period of a
week or more. In one establishment, hourly workers who
have been in the employ of the company for at least one
year are paid for three of the Saturdays on which the plant
        <pb n="67" />
        VARIATIONS OF THE FIVE-DAY WEEK 57

is closed; those with two years’ service are paid for six
Saturdays; and for each additional year of service, up to
ten, payment it made for two additional Saturdays. Employees
 with ten or more consecutive years of service receive
pay for the full twenty-two Saturdays on which the plant
is closed during the vear.

[nTerMITTENT F1vE-DAY WEEK OPERATION
The five-day week with a decrease of hours per week and
without wage reductions has been used by many companies
as a device for reducing production during periods of slack
demand or business depression, but such instances hardly
deserve consideration in a study of the five-day week as an
accepted and regular working schedule.
Obviously, a contraction in the demand for a product
usually calls for temporary curtailment of output. Business
policy differs as to the best means for bringing about such
curtailment. Some executives believe that the plant should
continue to operate on full schedule as long as possible, and
that reduction in output should be effected by weeding out
the least desirable employees. Probably the majority of
executives, however, believe it important to conserve their
working force in order that it may function promptly when
normal operation is resumed. There is also a growing disinclination
 among them, in a period of general depression, to
aggravate a bad situation by adding to unemployment at a
time when opportunities for securing other employment are
few. Consequently, these executives gradually reduce their
hours of operation per week, and the first step in such a
reduction 1s often the five-day schedule. If the business
recession or the falling off in demand for production is not
severe, they may not consider it necessary to make further
reduction in working time.
The duration of the emergency necessitating five-day week
operation may be limited, and regular operation may be
resumed after only a few weeks or months. On the other
hand, there are instances when protracted depression in the
industry or a chronic condition of over-production require the
retention of the five-day schedule for a number of years. But
so long as management does not consider the five-day week
z
        <pb n="68" />
        4)

THE FIVE-DAY WEEK

the accepted working schedule and intends to revert to the
longer schedule as soon as conditions justify such a step, these
work arrangements are “de facto” rather than “de jure”
instances of the five-day week.

Tue Five-Nicur Week
Although not so widely known as the regular five-day week,
the short week schedule applied to night work is older and
relatively more general. The reason for its early adoption
and its prevalence in establishments that make a practice of
operating night shifts is obvious. Since night shifts cover the
late part of one day and the early part of the next, work
during only five nights each week will obviate encroachment
upon Sunday. Furthermore, night work is frequently instituted
 to meet demands for which ordinary overtime work is
inadequate, but which can be satisfied by working five nights
in the week.
In another study recently conducted by the Conference
Board,! it was found that nearly half of the establishments
that reported night operation confined these operations to
five nights in the week, as shown in Table 10. If from the
plants which operated six and seven nights per week those
are subtracted whose service or processes demanded continuous
 operation—namely, chemical, paper and pulp and
gas and electricity plants—the five-night group would constitute
 659, of the total.
When night work is conducted on the basis of regular
rotating shifts, the working hours at night are equal in length
to those of the day shifts, but where a fixed night shift is
operated, either permanently or as a temporary expedient,
there is a tendency toward longer working hours at night than
during the day. Table 10 shows a considerably greater tendency
 toward long hours in night shifts of plants on a fivenight
 schedule than in those working six or seven nights.
Some employers expressed the opinion that the efficiency of
night crews was impaired when such long shifts were worked,
but the majority felt that any undue strain or fatigue that
may have resulted was counteracted by the additional leisure
provided by the long week-end.
National Industrial Conference Board, “Night Work in Industry.” 1927.
        <pb n="69" />
        TasLe 10: Hours or NicHT Work IN 202 MANUFACTURING EstABLISHMENTS, CLASSIFIED BY
InpUsTRY
(Source: National Industrial Conference Board)

Five Nights per Week
Hours per Night

{industry

3 |}

» 58

Automobiles. .......... .........
Boots and shoes. .................
Cement—lime—brick.............
Chemicals. .......c..ovvvvinnn
Electrical manufacturing. .........
i
Foundries and machine shops ......
Gas and electricity. ..............
Glass. o.oo ieee
Ironandsteel....... ............
cumber. Loi
Dorel. . cums vss vssrmiiinnnss
MEE ve #5 ciewiid £28 88 5 5 Bibammn ws
Paper and pulp products..........
Printing.......covvvinnninnnnn.,
Rubber ........coviiiiiiiinn.n.
Sugar refining ...........vuee....
Telegraph and telephone ..........
Textiles.  ...ooiiviiininnnn...
Total

10 '10%]

11 1136) 12 123)
ta",

13

2

1

)
2

11 2...
B8l3]lelol1listelas]2]2
r

Six Nights per Week
Hours per Night

Seven
Nights per
Week
Hours per
Night

»
3

yg =

s6l 100] uinzfnis le

2

z

-
T
1

N

+

An

3
4

g
7]
T
ot

)

co) "it ee rea
2s Tl rm
TT 25

FA,
£
        <pb n="70" />
        20

THE FIVE-DAY WEEK

Confining night operation to five nights a week is considered
 by many employers as an advantage in recruiting a
high caliber night force. Difficulty is often encountered in
obtaining an efficient night crew, for the reason that the
steadier and more desirable employees tend to prefer day
work, because of the disorganization of their accustomed
routine caused by reversing the periods for work and rest.
The attraction of the long week-end has, therefore, been
found of considerable assistance in offsetting the disadvantages
 of night work. The general considerations involved in
a working schedule of five nights are quite different from
those connected with the five-day week, and the two forms of
the shortened week schedule are therefore not entirely comparable.

These adaptations or variations of the five-day week principle
 have been discussed briefly because they indicate that,
in addition to the companies that have adopted this schedule
as a permanent basis of operation, others are either experimenting
 with it in a modified form or are applying it as a
temporary expedient. It was shown earlier in this discussion
that many companies now operating on a year-around fiveday
 basis were led to this decision by their experience with
the shortened work week in summer. Therefore, the temporary
 five-day schedule is likely to play an important part
in whatever development may result in future with respect
to the five-day work week principle.
        <pb n="71" />
        CHAPTER VI
GENERAL SUMMARY

HE five-day week work schedule is not, as is frequently
assumed, a novelty of the last few years. The earliest
instance of its use noted in this study occurred in 1908,
and in this case the short weekly work arrangement has been
maintained continuously for twenty years. Five of the 270
companies herein reported were found to be operating on a
regular five-day schedule which had been introduced prior to
1914. The greatest progress in the movement for the shorter
work week, however, has been made since 1923, as evidenced
by the fact that 719, of the companies reporting the date of
introduction of the five-day week had adopted this schedule
between 1923 and 1928.
The total number of wage earners employed under a
permanent five-day schedule is not definitely known. However,
 data published by the American Federation of Labor in
November, 1928, indicate that 164,479 of its members in
twenty trades were at that time on this schedule, and the
Conference Board’s study shows 270 manufacturing companies
 employing 216,921 persons on the basis of a five-day
work week. Allowing for a certain amount of duplication
and also for cases of five-day operation that were not discovered
 in either study, it would seem safe to estimate that
about 400,000 persons were working on a five-day weekly
basis at the close of 1928. This number for 1928 was substantially
 exceeded with the granting of the five-day week to
large groups of building trades workers in August, 1929.
Yet, in spite of the fact that the five-day week has been
adopted more widely than is perhaps generally realized, it
still applies to only a relatively small proportion of the industrial
 working population. The total number of wage earners
employed by the 270 companies reported in this study to be
operating on a permanent five-day schedule constituted only
about 2.6%, of the industrial wage earners in this country,
and 809 of this number were employed by the Ford Motor
Company. Consequently, while the growth in recent years
61
        <pb n="72" />
        52

THE FIVE-DAY WEEK

and the present status of the five-day week are significant,
this significance lies more in the future possibilities than in
the present importance of this work arrangement.
Companies that employ this work schedule represent a
number of industries and types of processing, but they are
generally of the non-continuous, as contrasted with the continuous-process
 type. Where the process has no fixed time
element, the five-day schedule appears to be susceptible of
wide application, but in continuous-process industries a five.
day week for employees must mean either the loss of one or
two days’ production each week or the employment of additional
 workers to provide a form of revolving shift. It is the
latter expedient that has enabled the Ford Motor Company
to apply the five-day principle even to the operation of coke
ovens, blast furnaces and open hearth steel works.
In general, it may be stated that the five-day week is more
prevalent in small than in large establishments, and that
most of the exponents of this schedule in the industrial field
are located in the northeastern section of the country, particularly
 in and around New York City. The Ford Motor
Company is an outstanding exception to both of these generalizations.


ProsLems INvoLvED Iv Five-Day Week OpERATION
The change from a five-and-one-half or a six-day to a fiveday
 weekly working schedule is likely to raise certain questions
 of administrative policy. Even if the shift to the
shorter schedule is accomplished without a reduction in total
number of working hours per week, the question of relative
efficiency and of quantity and quality of output in the longer
working day is raised, and also the question whether the rate
of pay for Saturday work, when necessary, shall be straight
time or overtime.
The first problem in a consideration of five-day week
operation is the disposition of hours formerly worked on
Saturday. These may be distributed over the five working
days in such manner that none of the former working time is
lost; part of the Saturday hours may be retained and allotted
among the other days and the remaining time dropped; or
all of the Saturday hours may be eliminated from the weekly
        <pb n="73" />
        GENERAL SUMMARY

63

work schedule. Eighty-six per cent of the 219 companies
that furnished information as to the policy followed in this
matter had reduced their total working hours per week
in changing to the five-day week, some only slightly, others
substantially. Where the change had come as the result of
an agreement with organized labor, the work week under the
five-day plan was usually set at forty hours.
In some cases, the adjustment of the work week to five
days had been rendered difficult by legislation limiting the
hours per day during which women could be émployed.
With the hours of work per week reduced in changing to
the five-day week, the question of possible wage adjustment
immediately arises. If the five-day schedule is imposed by
organized labor, as was the case in certain apparel industries,
the five-day, 40-hour week without change in wage scales is
usually specified. Since wage scales in these trades are customarily
 on a weekly basis, this arrangement results in fewer
hours of work per week without reduction in wages. Where
decisions on these matters have been made without pressure
from labor unions, some companies have altered wage scales
to permit the earning of as high, or nearly as high, wages
under the shorter schedules as under the longer, while others
have left the wage scales unchanged. In some cases hourly
rates were adjusted and piece rates remained at former levels,
on the theory that piece work permits employees to maintain
their former weekly earnings if they apply themselves sufficiently
 to their work.
In some unionized plants covered in this study, overtime
work was forbidden and therefore all Saturday work was
under the ban. Other plants had not found Saturday work
necessary at any time. About a third of the plants which
furnished information on this subject, however, had found it
advisable, at one time or another, to operate on Saturdays.
In approximately two-thirds of these establishments Saturday
 work was placed in the same category as other overtime
work and was compensated at higher than normal rates, but
in 309% of the establishments the regular rates remained in
force for Saturday work. A considerable majority of companies
 that paid higher than normal rates for Saturday work
paid on the basis of time and one-half, but a few instances
were noted in which double time was paid.
        <pb n="74" />
        54

THE FIVE-DAY WEEK

Erreers or TE Five-Day WEEK on OPERATING EFFICIENCY
The effect upon production is likely to be the test by which
the practicability of the five-day week is judged, but it is
difficult to demonstrate this effect statistically. Changes in
product or process, in administrative procedure or in business
conditions, often coincide with the shift in working schedules,
so that it is impossible to determine with any accuracy the
effect of the five-day schedule upon output. But, while exact
statistical comparison may be impossible, managements appear
 to hold settled beliefs as to whether the shorter schedule
has or has not affected the volume of output. The executives
of 127 companies expressed convictions upon this point. In
68% of the plants in which hours per week had been reduced
in changing to the five-day schedule, it was believed that output
 per week had been maintained or increased. This same
condition was found in 979, of the establishments in which
no change had been made in the weekly total of hours of
work. In all, 75% of the reporting companies expressed no
complaint on the score of reduction in total output.
Certain economies are attributed to five-day operation.
The uneconomical overhead cost of operating a plant on
Saturday half-days is eliminated, and, particularly in companies
 which maintain their own steam power plant, this is
by no means a negligible item. Moreover, since output on
Saturday half-days has quite generally been found to be below
 standard, the distribution of this time, or part of it, over
the other five days has tended to produce higher output per
hour for the week. Even where the Saturday time had not
been made up, the elimination of these. hours has not been
regarded as a total loss. Where processes required rather
elaborate and time-consuming starting and stopping procedure,
 the elimination of one such routine a week has meant
a substantial saving in unproductive time and expense.
Considerable stress has been laid upon the advantage
of devoting Saturday forenoons to careful overhauling and
repair of plant and equipment. It was the general experience
that such work was performed more thoroughly when plenty
of time was available, and that the consequent reduction in
machine breakdowns during productive operation constituted
a definite gain towards more economical production.
        <pb n="75" />
        GENERAL SUMMARY

65

Attendance and punctuality were generally found to be
improved as a result of five-day operation. Furthermore,
such a schedule was thought to attract and hold desirable
employees, whose appreciation of the two free days each week
found expression in the volume and quality of their output.
Employers generally were satisfied that the shorter working
schedule has had a pronounced effect in raising the morale
of the working force.
Objections reported to the five-day week, or to certain
features of it, were neither so frequent nor so fundamental as
the advantages cited in its favor. Employers who had
adopted this schedule at the instigation of organized labor,
as a rule considered it an imposition and were disinclined to
see it in a favorable light. Others admitted disadvantages or
handicaps, but did not consider them insurmountable. The
fact that Saturday is an important day in some industries has
made it difficult to accustom purchasers to the fact that the
plant is closed on that day. A few employers expressed disapproval
 that some employees accepted other remunerative
employment on the day that it was believed should be devoted
 to rest and recreation. Others questioned whether the
distribution of Saturday hours over the other five days had
not made these days too long for best results, especially in the
high temperature of the summer and in the longer hours under
 artificial light in the winter. In some cases a decline in
quality of work has been attributed to this cause.
The attitude of employees appears to have been quite universally
 favorable to the five-day schedule, even when it had
resulted in some loss in wage earnings. Married women, in
particular, appreciate the extra time for household duties,
and men value the day for making repairs on their houses
and cultivating their gardens or attending to other personal
matters. Throughout the year one trip to and from the
plant for only a half-day’s earnings is eliminated, and in
the summer months the longer week-end makes possible the
enjoyment of trips farther away from home. General experience
 with the five-day weekly work schedule led both
the employers and employees represented in this study to
favor this arrangement.
Like most departures from prevailing practice, the five
        <pb n="76" />
        56

THE FIVE-DAY WEEK

day week, at least at first, has certain drawbacks. With
respect to this issue, however, the disadvantages appear to
have been outweighed by the advantages derived. The preponderance
 of opinion in favor of the five-day week schedule
indicates that in most plants reporting it has commended
itself to both management and working force.

CoNcLUSION

The conclusion that any or all industrial establishments
could advantageously adopt the five-day week schedule does
not follow from the evidence offered in its favor by a majority
of the companies that are qualified from experience to appraise
 its advantages and drawbacks. This evidence does,
however, remove the five-day week from the status of a
radical and impractical administrative experiment and places
it among the plans which, however revolutionary they may
appear to some, have demonstrated both practicability and
usefulness under certain circumstances. An employer who is
interested in the adaptability of the five-day schedule to his
own business may, therefore, approach the problem as a
working schedule that has been in force for a number of
years in various establishments with generally satisfactory
results.
Whether or not the application of the five-day week will
be extended to industry generally, and whether such extension
 would be economically sound and socially desirable, are
questions that lie in the field of conjecture and opinion and
are outside the scope of this study. The relatively very small
number of individual instances of its application here surveyed,
 and the circumstances, sometimes inherent in special
cases and sometimes imposed, under which the applications
were made, afford no adequate basis for answering the
broader economic and social questions reflected in the shortening
 of working hours. In the end, the question of the
length and arrangement of the working week is likely to be
settled, not on the basis of theoretical principles but by the
practical experience of employers and workers, individually
and in groups; and the general practice may ultimately
even run counter to these principles and ignore the theoretical
problems involved.
        <pb n="77" />
        APPENDIX

LIST OF REPRESENTATIVE COMPANIES OPERATING ON A
REGULAR FIVE-DAY WORK WEEK

Company Location
Simon Ackerman Clothes Co... ..... Rochester, N.Y.
Addison Lithograph Co........... Rochester, N.Y.
American Chicle Co............... Long Island City, N.Y
Amos Abbot Co..... +... Dexter, Me.
Beatty Page, Inc.................New York City
Bellman Brook Bleachery Co. . ... Fairview, N.J.
Bemis Car Truck Co..............Springfield, Mass.
E.W.BlissCo...................Brooklyn, N.Y.
Simon Bomzer Co................New York City
Boston Bank Note Co...:..........Boston, Mass.
Moto Meter Co., Inc..............LongIsland City, N.Y
C. C. Bradley and Son, Inc... .....Syracuse, N.Y.
Breslin Brothers Carpet Co....... Gloucester, N.J.
Bristol Myers Co.......-.........Hillside, N.T.
Chicago Carton Co.. Chicago, IIL

Consolidated Fruit Jar Co... ...,, .. New Brunswick, N.J.
Consolidated Lithographic Ce... ...Brooklyn, N.Y.
Consolidated Paper Co............. Monroe, Mich. .
Continental Mills. ................ Philadelphia, Pa.
Cranshaw Carpet Co..............Newburgh, N.Y,
Curtis Publishing Co..............Philadeiphia, Pa.

Henry A. Dix Corp.. ...New York City
Dorfand Co..................... Baltimore, Md.
Doubleday Doran and Co., Inc... ...Garden City, L.L,,
N.Y.
Douglas Mack Co...... veers. New York City
L. A, Dreyfus Co.................Rosebank, S.I., N.Y.
E. R. Durkee and Co.. ...........Elmhurst, L.I,, N.Y.

Dutchess Hat Works. .

.. Beacon on Hudson,
} N.Y.
Eberhard Faber Pencil Co... ......Brooklyn, N.Y.
Eberhard Faber Pencil Co. (Rubber
Division). ...vccvenerveienes... Newark, N.J.
Einson-Freeman Co., Inc..........New York City
J. Eisner and Sons Co., Inc........Brooklyn, N.Y.
Electric Meter Corp... ............New York City
Empire Lithographing Company. ..New York City
Empire Worsted Mills Co... ...... Jamestown, N.Y.
Ford Motor Car Co... ...eue.-.... Detroit, Mich.
Robert Gair Co.....vvveeenn...... New York City
Gardner &amp;amp; Harvey Co.............Middletown, O.
Wm. P. Goldman and Bros., Inc... .. New York City
A. Goldstein and Co.. .New York City
5

Product
Clothing
Lithographing
Chewing Gum
Woolens
Printing
Dyeing and Bleaching
Railroad Supplies
Machinery
Clothing
Lithographing
Motometers
Power Hammers
Carpets
Chemicals
Paperboard Boxes and
Cartons
Stamped Metalware
Lithographing
Paperboard
Textiles
Carpets
Printing and Publishing

Uniform Dresses
Hats and Caps

Publishers
Clothing
Gutta Percha
Salad Dressing and
Spices

Hats
Lead Pencils

Rubber Sundries
Lithographing
Clothing
Electric Meters
Lithographing
Textiles
Automobiles
Paperboard and Boxes
Paperboard and Boxes
Clothing
Boys’ Clothing
        <pb n="78" />
        5

THE FIVE-DAY WEEK

Company Location
Goodman and Levine. . .. Rochester, N.Y,
Gordon and Friedman. .... ...New York City
Grinnell Lithographic Co......... New York City
Grossman Clothing Co... ..... . New York City
J. J. Grover’s Sons Co............ Stoneham, Mass
Frederick Gumbrecht Co......... Brooklyn, N.Y.
Karl Gut Lithographing Co... .... Bronx, N.Y.
Hardwood Counter Co........... Lynn, Mass.
Hdarodite Finishing Co............. Taunton, Mass.
R.R.Heywood Co................New York City
Hoag and Walden, Inc... ..........Lynn, Mass.
Hochscheid’s Pants Co............Mt. Healthy, O.
L. Hofman Co................... New York City
Horowitz Bros. and Margareten. . ..New York City
F. C. Huyck and Sons. ...........Albany, N.Y.
lig Ventilating Co. . . . Chicago, 111.

Product
Clothing
Clothing
Lithographing
Clothing
Shoes
Lithographing
Lithographing
Shoe Counters
Dyeing and Finishing
Lithographing
Shoes
Clothing
Paper Boxes
Matzoth and Noodles
Woolens
Heating and Ventilating
 Apparatus
Valves
Rubber Goods
Clothing
Clothing
Lithographing
Clothing
Hats
Soap
Clothing
Tobacco

Jenkins Bros.................... Bridgeport, Conn.
Jenkins Bros. (Rubber Division)... . Elizabeth, N.J.
Joseph and Feiss Co..............Cleveland, O.
{ahn Tailoring Co................Indianapolis, Ind.
Karle Lithograph Co..............Rochester, N.Y.
Xeller-Heumann Thompson Co.... Rochester, N.Y.
Xessner and Rabinowitz Co... .....Union City, N.J.
Kirkman and Sons...............Brooklyn, N.Y.
Lamm Bros...........ccvuue..... Boston, Mass.
Larus and Brother Co.............Richmond, Va.
Lathum Lithographing and Printing
COuoovveveeveennnneeeunaen... Longlsland City,N.Y, Lithography
C.M. and D. B. Leavitt Co... ..... Haverhill, Mass. Shoes
Le Roy Latham Printing Co...... Woodside, L.I., N.Y. Printing and Litho.
graphing
Clothing
Clothing
Woolens
Printing
Metal Tubing and Hose
Clothing
Work Suits
Clothing
Water and Oil Meters
Boilers
Metal Goods
Wash Suits
Lithographing
Aircraft Instruments
Rubber Products
Hand Bags
Heels
Clothing
Boxes and Lithographing

Machinery
Lithographing
Underwear
Clothing
Lithographing
Lithographing

Rochester Manufacturing Co.. . ....Rochester, N.Y.
Rode and Brand Co...............New York City
M. H. Rosenberg and Co... ........New York City
M. H. Rosenmond and Co... .......New York City
Sackett and Wilhelms Corp.. .......Brooklyn, N.Y.
Sale Lithograph Co. Buffalo, N.Y.
        <pb n="79" />
        APPENDIX

Company
Schmidt and Ault Paper Co.. ..... York, Pa.
Seabright Woven Felt Company... Camden, Me.
Seiter and Kappes Lithograph Co.. New York City
Shirek and Hirsch Couv..vvvz..... New York City
Snyder and Black Co............. .New York City
A. G. Spaulding and Bros......... Chicopee, Mass.
Stecher Lithographing Co.. ....... Rochester, N.Y.
J. Stevens Arms Co. ......ovtnns Chicopee Falls, Mass
Strauss and Buegeleisen Co.. ..... Brooklyn, N.Y.
Sweet Orr and Co., Inc... ..es..... New York City
Trautman Bailey and Blampey Co.. New York City
Trimont Manufacturing Co., Inc... Roxbury, Mass.
Tucker Lithograph Co., Inc........ Long IslandCity, N.Y
Unit Laundry Co... .ooeenneonnn Newark, N.J.
U. S. Printing and Lithograph Co... .. Brooklyn, N.Y.
David Weil Sons Litho Co... ..... Brooklyn, N.Y.
Whitehouse Leather Products Co.,
Inc... New York City

Location

J. Wise and Co., Inc. ...coiene New York City
J. R. Wood and Sons. ........... . Brooklyn, N.Y.
Wright Aeronautical Corp......... Paterson, N.J.
Wm, Wrigley, Jr... .. ooevnee Chicago, Ill.
Zabel Bros. Co. . Philadelphia, Pa.

£C

Product
Paperboard
Felts
Lithographing
Clothing
Lithographing
Sporting Goods
Lithographing
Guns and Rifles
Goggles
Clothing
Lithographing
Tools
Lithographing,,
Laundry
Printing
Lithographing

Bags and Leather Products

Dresses
Jewelry
Aero Engines
Chewing Gum
Printers and Lithographers
        <pb n="80" />
        ali HE aw

Colt
MNARN0403868
        <pb n="81" />
        z
3G
- §=fig

3 $y
39°
Onl)
; No

0
NS

APPENDIX

A

m
wn

OF REPRESENTATIVE COMPANIES OPERATING ON A
REGULAR FIVE.DAY WORK WEEK

&amp;gt;
on

MD
Ty

oe
oo

ul
-

=
*

£

2
©

=
5)

&amp;gt;
ND)

2
a
0
~—d

J
ri

jet
~~]

Company Location
. Ackerman Clothes Co....... Rochester, N.Y.
on Lithograph Co........... Rochester, N.Y.
can Chicle Co............... Long Island City, N.Y
Abbot Co... ... .. Dexter, Me.
y Page, Inc.................New York City
in Brook Bleachery Co. .... Fairview, N.J.
Car Truck Co..............Springfield, Mass.
Bliss Co...................Brooklyn, N.Y.
Bomzer Co................New York City
n Bank Note Co.............Boston, Mass.
Meter Co., Inc... ...........LonglIsland City, N.Y
Bradley and Son, Inc........Syracuse, N.Y.
n Brothers Carpet Co. ...... Gloucester, N.J.
l Myers Co.............. , Hillside, N.J.
go Carton Co.. Chicago, Ii.

slidated Fruit Jar Co........ New Brunswick, N.J.
slidated Lithographic Co,. .. . .Brooklyn, N.Y.
slidated Paper Co............ Monroe, Mich. .
inental Mills. . .... ..... Philadelphia, Pa.
shaw Carpet Co... .« ..Newburgh, N.Y,
8 Publishing Co.. . . .. .Philadelphia, Pa.

7 A. Dix Corp.. ..New York City
and Co.....................Baltimore, Md.
ileday Doran and Co., Inc..... Sly City, L.1.,
Ye
las Mack Co....... ....New York City
Dreyfus Co......... .......Rosebank, S.I, N.Y.
Durkee and Co.. .veeese Elmhurst, LL, N.Y.
hess Hat Works. . .. . Beacon on Hudson,
N.Y.
ard Faber Pencil Co... ......Brooklyn, N.Y.
nard Faber Pencil Co. (Rubber
vision). ...............u..... Newark, N.J.
m-Freeman Co., Inc... .......New York City
sner and Sons Co., Inc........Brooklyn, N.Y.
ric Meter Corp... ............New York City
ire Lithographing Company. ..New York City
ire Worsted Mills Co... ..."....Jamestown, N.Y.
Motor Car Co...............Detroit, Mich.
irt Gair Co...................New York City
ner &amp;amp; Harvey Co............. Middletown, O.
P. Goldman and Bros., Inc.. ...New York City
oldstein and Co. New York City

i

Product
Clothing
Lithographing
Chewing Gum
Woolens
Printing
Dyeing and Bleaching
Railroad Supplies
Machinery
Clothing
Lithographing
Motometers
Power Hammers
Carpets
Chemicals
Paperboard Boxes and
Cartons
Stamped Metalware
Lithographing
Paperboard
Textiles
Carpets
Printing and Publish.
ing
Uniform Dresses
Hats and Caps

Publishers
Clothing
Gutta Percha
Salad Dressing and
Spices

Hats
Lead Pencils

Rubber Sundries
Lithographing
Clothing
Electric Meters
Lithographing
Textiles
Automobiles
Paperboard and Boxes
Paperboard and Boxes
Clothing
Boys’ Clothing

Q
00

ak
J
™

jos)
oo

&amp;gt;
1
        <pb n="82" />
        <pb n="83" />
        <pb n="84" />
        <pb n="85" />
        <pb n="86" />
        <pb n="87" />
        <pb n="88" />
        <pb n="89" />
        <pb n="90" />
        <pb n="91" />
        <pb n="92" />
        <pb n="93" />
      </div>
    </body>
  </text>
</TEI>
