pumps were installed at Zuurbekom, the necessary
~lectric power being generated at and transmitted
from the Central Pumping Station of Zwartkopjes,
bout 17 miles distant.

143. Vaar River Barrace: In 1911, the
demands of the Board’s consumers had increased
to such an extent that the Board instructed its Chief
Engineer to investigate and report upon the question
 of obtaining a large permanent water supply
from a catchment area. As the result of the Chief
Engineer’s investigations, and on his recommenda-Hon,
 the Board, in September, 1913, adopted a
scheme involving the construction of a barrage
across the Vaal River at a point about 25 miles
Selow Vereeniging, to impound a quantity of water
in the river-bed sufficient to yield a constant supply
at the rate of 20 million gallons daily, and the installation
 of plant and mains to deliver a first instalment
 of 10 million gallons a day to the Rand. THe
necessary powers in this regard were obtained from
‘he Union Parliament in June, 1914, but the outbreak
 of the war a few months later rendered a
commencement of the work impossible for two
ears.

144. Early in 1916, the Board decided to proceed
 with the construction of the barrage across the
Vaal River. This work was commenced in July,
1916. and completed in October, 1922.

The works necessary to bring a supply of five
million gallons a day to the Rand from the Vaal
River were commenced in 1920, the Board having
adopted the smaller unit in preference to the first
instalment of 10 million gallons a day included in
the original scheme approved by the Board in 1913.